Skip to main content

Enel and ENI reach Italian electric vehicle charging station deal

Italian utility Enel has reached an agreement with ENI, the Italian oil and gas group, to boost the presence of electric vehicle charging facilities at petrol stations. Enel has already created a fast vehicle charging station that uses 43kW alternating current, providing a charge of up to 80% in about 30 minutes. The first charging stations will be delivered by March 2013 across ENI's 4,700 petrol stations.
January 4, 2013 Read time: 1 min
Italian utility Enel has reached an agreement with 7068 ENI, the Italian oil and gas group, to boost the presence of electric vehicle charging facilities at petrol stations.

Enel has already created a fast vehicle charging station that uses 43kW alternating current, providing a charge of up to 80% in about 30 minutes. The first charging stations will be delivered by March 2013 across ENI's 4,700 petrol stations.

For more information on companies in this article

Related Content

  • OEMs unveil raft of major new excavator and wheeled loader models
    May 13, 2025
    Original equipment manufacturers have launched a range of new excavators and wheeled loaders including electric models, and features such as autonomous driving, remote control advanced driver assistance and special applications. Liam McLoughlin reports.
  • New runway for US military airbase in Florida
    December 7, 2017
    A new runway surface has now been laid at MacDill Air Force Base in the US, located approximately 6.4km south-west of downtown Tampa, Florida. This facility is the base for the US Air Force’s Air Mobility Command, which provides airlift, special missions, aerial refuelling, and aeromedical evacuation for the armed forces. MacDill is home to 16 KC-135 Stratotankers and three C-37 Gulfstreams, which use the runway every day. At any point, there will be a steady flow of aircraft departing and landing on the
  • Doosan’s new DX140LC-3 and DX160LC-3 crawler excavators
    June 24, 2013
    Both machines are powered by Doosan’s DL06K ‘common rail’ six-cylinder turbocharged diesel engine, said to meet Stage IIIB engine emission regulations through the use of EGR (Exhaust Gas Recirculation) and Diesel Particulate Filter (DPF) after-treatment technologies. The engine has a displacement of 5,890cm³ and is said to deliver 15% more power [82 kW @ 1850RPM] than previous Stage IIIA models. The engine also delivers 11% more torque (49.5kgf.m) in the DX160LC-3 model. Doosan said that factory tests had
  • Testing extension for UK vehicles
    March 26, 2020
    UK vehicles will be given an extension on annual safety checks.