Skip to main content

Emissions regulations a challenge

According to the VDMA the introduction of the EU-Exhaust Emission Regulation Stage III B poses a challenge for construction machinery manufacturers. It says the expense is enormous; a great deal of investment and development capacity is necessary; for the buyers that means higher prices, and in some cases greater efficiency on the building site. VDMA (German Engineering Federation) sees tighter regulation as “counter-productive,” and while the manufacturers have still got their hands full with refitting a
May 10, 2012 Read time: 2 mins
According to the 1331 VDMA the introduction of the 3287 EU-Exhaust Emission Regulation Stage III B poses a challenge for construction machinery manufacturers.

It says the expense is enormous; a great deal of investment and development capacity is necessary; for the buyers that means higher prices, and in some cases greater efficiency on the building site.

VDMA (German Engineering Federation) sees tighter regulation as “counter-productive,” and while the manufacturers have still got their hands full with refitting and upgrading their machines to Stage III B, in Brussels, Belgium, discussions about a Stage V are already underway.

“Whether it will come and when and for how long Stage IV [it will apply from 2014] will ultimately stay in force as a result, neither the responsible officials nor the politicians can say,” says VDMA.

According to Frank Diedrich in Brussels, who represents the interests of the construction and also the agricultural machine manufacturers affected by the regulation within the VDMA, the engine manufacturers are calling for a period of at least five years. Just how long it will really be however, no one knows today.

The VDMA says the European construction and agricultural machine manufacturers are also clearly rejecting the introduction of further exhaust emission regulations.

For more information on companies in this article

Related Content

  • Mixing recycled and fresh asphalt reduces costs
    February 14, 2012
    An innovative asphalt plant is allowing the use of recycled materials and achieving major cost benefits - Mike Woof reports. UK construction firm FM Conway is seeing the benefit of the €11.5 million (£10 million) it has invested in its asphalt production facilities at Erith in Kent, close to UK capital London, since buying the site in 2005. The biggest single investment in the facility has been a new Benninghoven asphalt plant, which was commissioned in June 2010 and is now the core of the Erith operation.
  • Leading manufacturers demonstrate asphalt recycling expertise
    November 13, 2013
    Cutting-edge RAP production technology and other key asphalt plant equipment in demand globally is examined by Guy Woodford Grossmann, a building services company based in south-east Germany, is now using a state-of-the-art Benninghoven Competence BA 4000 asphalt plant to produce asphalt. Equipped with Benninghoven’s Hot Recycling System RA 180, the plant is said to be highly efficient, economical and one of the most powerful available.
  • Caterpillar’s 2016 results reflect tough market conditions
    January 31, 2017
    Caterpillar’s financial results for 2016 reflect the tough trading conditions that US construction machine firms in particular have been experiencing. In another development, the firm is looking to move its global corporate headquarters from Peoria to Chicago.
  • Safety improvements in developed nations
    August 20, 2013
    At a time when road safety is posing a significant threat to both human health and economic development around the world, it is worth noting that in many developed nations the situation is improving. The United Nations has identified road safety as a major problem and established its Decade of Action for Road Safety for the 2010-2020 period, in a bid to cut the growing death toll. But while developing nations are seeing a vast growth in vehicle numbers and road fatalities, the improving road safety situ