Skip to main content

Emissions regulations a challenge

According to the VDMA the introduction of the EU-Exhaust Emission Regulation Stage III B poses a challenge for construction machinery manufacturers. It says the expense is enormous; a great deal of investment and development capacity is necessary; for the buyers that means higher prices, and in some cases greater efficiency on the building site. VDMA (German Engineering Federation) sees tighter regulation as “counter-productive,” and while the manufacturers have still got their hands full with refitting a
May 10, 2012 Read time: 2 mins
According to the 1331 VDMA the introduction of the 3287 EU-Exhaust Emission Regulation Stage III B poses a challenge for construction machinery manufacturers.

It says the expense is enormous; a great deal of investment and development capacity is necessary; for the buyers that means higher prices, and in some cases greater efficiency on the building site.

VDMA (German Engineering Federation) sees tighter regulation as “counter-productive,” and while the manufacturers have still got their hands full with refitting and upgrading their machines to Stage III B, in Brussels, Belgium, discussions about a Stage V are already underway.

“Whether it will come and when and for how long Stage IV [it will apply from 2014] will ultimately stay in force as a result, neither the responsible officials nor the politicians can say,” says VDMA.

According to Frank Diedrich in Brussels, who represents the interests of the construction and also the agricultural machine manufacturers affected by the regulation within the VDMA, the engine manufacturers are calling for a period of at least five years. Just how long it will really be however, no one knows today.

The VDMA says the European construction and agricultural machine manufacturers are also clearly rejecting the introduction of further exhaust emission regulations.

For more information on companies in this article

Related Content

  • Develop the Silk Roads, boost economic growth
    April 12, 2012
    Tony Pearce, honorary life member and former director-general of IRF Geneva, recalls the history of the Silk Roads, highlights their continued economic relevance and introduces IRF's active long-term commitment to their rehabilitation.
  • Volvo CE bridging the gap for new Indian transport links
    December 11, 2013
    The old Pakuria Bridge in Jharkhand, India, ran over a dry riverbed and railway line situated 20km from Calcutta. Now obsolete, the bridge has been brought to the ground in 60 days using Volvo construction equipment West Bengal in eastern India is the nation’s fourth most populous region, boasting more people than the whole of Germany. The state is bordered by Nepal, Bhutan, Bangladesh, and five other states of India with more than 91 million inhabitants spread over 34,267m².
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Benninghoven | The fuels of the future are carbon neutral
    September 5, 2022
    Benninghoven burners enable reliable use of renewable and therefore sustainable energy sources