Skip to main content

Emissions regulations a challenge

According to the VDMA the introduction of the EU-Exhaust Emission Regulation Stage III B poses a challenge for construction machinery manufacturers. It says the expense is enormous; a great deal of investment and development capacity is necessary; for the buyers that means higher prices, and in some cases greater efficiency on the building site. VDMA (German Engineering Federation) sees tighter regulation as “counter-productive,” and while the manufacturers have still got their hands full with refitting a
May 10, 2012 Read time: 2 mins
According to the 1331 VDMA the introduction of the 3287 EU-Exhaust Emission Regulation Stage III B poses a challenge for construction machinery manufacturers.

It says the expense is enormous; a great deal of investment and development capacity is necessary; for the buyers that means higher prices, and in some cases greater efficiency on the building site.

VDMA (German Engineering Federation) sees tighter regulation as “counter-productive,” and while the manufacturers have still got their hands full with refitting and upgrading their machines to Stage III B, in Brussels, Belgium, discussions about a Stage V are already underway.

“Whether it will come and when and for how long Stage IV [it will apply from 2014] will ultimately stay in force as a result, neither the responsible officials nor the politicians can say,” says VDMA.

According to Frank Diedrich in Brussels, who represents the interests of the construction and also the agricultural machine manufacturers affected by the regulation within the VDMA, the engine manufacturers are calling for a period of at least five years. Just how long it will really be however, no one knows today.

The VDMA says the European construction and agricultural machine manufacturers are also clearly rejecting the introduction of further exhaust emission regulations.

For more information on companies in this article

Related Content

  • Premiere in the Black Forest
    October 5, 2023
    One of the steepest sections of the B 500, an important road in the southern Black Forest, had to be renewed in the summer of 2023 – more precisely: the first kilometres behind the Triberg town sign, past the famous waterfalls. Asphalt paving specialists from Gebrüder Bantle GmbH & Co. KG were commissioned to resurface the carriageway.
  • Safety issues fuel interest at PIARC’s tunnel conference in Lyon
    June 4, 2019
    Alternative fuel and automated vehicle issues occupied minds at PIARC’s first international road tunnel safety conference. David Arminas reports from Lyon More than ever, tunnel management must done in a wholistic fashion, said Andre Broto, president of PIARC, the World Road Association, based in Paris. With those sentiments, Broto kicked off PIARC’s first International Conference on Tunnel Operations and Safety. One of the first speakers, Sandrine Bernabei Chinzi, head of transport infrastructure at Fr
  • Telematics could be an area for John Deere and Wirtgen resource sharing
    April 20, 2018
    The gods were smiling on the Wirtgen Group for the company’s Road Technology Days 2018 event. This year it was held in summer-like weather at the recently expanded Voegele plant near Mannheim in Germany. Within days the season dramatically changed from dreary chilly late winter to high temperatures, just in time to bathe the amassed demonstration equipment and the 4,000 guests in summer sunshine. But there won’t be any such dramatic changes within the Wirtgen Group, according to Domenic Ruccolo. After 28
  • Austria's new tunnel meets safety regulations
    July 13, 2012
    New safety regulations and high traffic volumes require new tunnel construction all across Europe. Mike Woof reports Anew highway tunnel now being built in Austria will boost traffic volumes and safety standards on a key European route. The existing Pfänder Tunnel lies close to Austria's borders with Germany and Switzerland and carries a heavy traffic volume, so a new parallel tunnel is under construction to help spread this load, increasing capacity as well as safety. Stringent tunnel safety standards have