Skip to main content

EIB lends €900mn for Poland’s S7 and S8 dual carriageways

Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
December 14, 2012 Read time: 1 min
Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the 1054 European Investment Bank (EIB).

The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.

For more information on companies in this article

Related Content

  • Bosnia: more funds for Corridor C5 work
    June 25, 2021
    Bosnia’s national road agency Autoceste FBiHreports reports that 92km of Corridor 5C have been completed.
  • Romanian roads under construction
    May 9, 2012
    Funding worth some €177.5 million from the European Commission (EC) will pay for a highway construction project in Romania. This non-refundable financing will pay for the construction of a 27.4km stretch of the Lugoj-Dumbrava highway. This section forms part of Lugoj-Deva highway that is itself a part of the Pan-European Corridor IV.
  • Ukraine's pivotal plans
    February 16, 2012
    The authorities in the Ukraine are in discussions regarding financing for a major road project, as well as making plans for the country's first ever highway concession.
  • Poland’s viaTOLL system expanded
    January 21, 2013
    The electronic toll system viaTOLL has been expanded in Poland. On 12 January 12 2013, an extra 140km of A1 motorway and S1 and S8 dual carriageways came under the viaTOLL network, according to the directive of the Polish Council of Ministers. A further 160km expansion of viaTOLL is scheduled for 30 March 2013.