Skip to main content

EIB lends €900mn for Poland’s S7 and S8 dual carriageways

Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
December 14, 2012 Read time: 1 min
Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the 1054 European Investment Bank (EIB).

The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.

For more information on companies in this article

Related Content

  • Poland plans push-starting project
    February 28, 2012
    In the wake of the difficulties in Poland over the withdrawal of Chinese contractor COVEC from the A2 highway project, the country's government is now looking for a way ahead.
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Poland awards three Expressway S19 sections
    March 11, 2017
    The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.