Skip to main content

Egis wins Olympic gold in Briançon

Egis will project manage a dedicated public transport lane for the RD1091 in the Hautes-Alpes department of the French Alps for the 2030 Olympic and Paralympic Winter Games in Briançon and the Serre-Chevalier valley.
By David Arminas July 25, 2025 Read time: 2 mins
RD1091, already a favourite with cyclists, will get a dedicated public transport and cycle lane between Briançon and Serre-Chevalier (image © Elenaphotos/Dreamstime)

As part infrastructure development for the 2030 Olympic and Paralympic Games in Briançon and the Serre-Chevalier valley, Egis will project manage modernisation of road RD1091.

The award was given to Egis - an international company active in the consulting, construction engineering and mobility service sectors - by the Hautes-Alpes department and the municipality of Briançon. It covers 16km or Route Departmental 1091 between Briançon and Serre-Chevalier.

There will be a comprehensive redevelopment of the road and construction of an additional lane dedicated for Olympics use and then for public transport and bicycles. The addition of what will be called the Olympic Lane will, in fact, be a dedicated lane for athletes to transfer between the Olympic Village in Briançon and the Olympic Stadium in Serre-Chevalier.

Olympic events, from February 1-17, will be held across the departments of Alpes-Maritimes and Hautes-Alpes in Provence-Alpes-Côte d'Azur - with the prefecture of Nice hosting most ice events - and the departments of Haute-Savoie and Savoie in Auvergne-Rhône-Alpes. Briançon will host skiing and snowboarding events.

After the Games, the new lane will relieve congestion on the RD1091, which is congested by constantly increasing tourist traffic in this mountainous area of the Auvergne-Rhône-Alpes and Provence-Alpes-Côte d'Azur regions. At an altitude of 1,326m, Briançon in the Hautes-Alpes department is the highest city in France.

Egis as lead contractor in a consortium will project manage during the design and construction phases. It will work with co-contractor ABEST Group which specialises in mountain infrastructure and competition venue development. Egis said it will mobilise local ABEST teams, notably in Seyssins and Marseille, alongside those of the in Ugine and Meylan. This will guarantee in-depth knowledge of regional issues and seamless coordination with local stakeholders throughout the project.

“Continuing our commitment [we had] for the Paris 2024 Games, we are proud to contribute to the success of the 2030 Winter Games,” said Diogo Taddei, director of sport and events at Egis. “This project demonstrates our ability to support major international sporting events while aligning our efforts with a legacy approach.”

For more information on companies in this article

Related Content

  • World Meeting Outreach Committee Chair makes the case for a wide engagement in the buildup to the 17th IRF World Meeting
    June 18, 2012
    Held every four years since 1952, IRF World Meetings have always offered the international road community a rare opportunity to present what they do best and discuss what they could do better. As he prepares to take on the role of chairman of the Outreach Committee, Jean-Claude Roffé, a senior manager at Colas, notes “there isn’t a single recipe for successful World Meetings, but collective experience gained over the last half-century provides guidance in at least three areas:” Local support, global succes
  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Delivering Measurable Outcomes through Performance-based contracts
    November 1, 2012
    At this time of tight public budgets, performance-based maintenance contracts are gaining traction internationally, with a growing number of transport agencies recognising it as an effective instrument for making investment decisions that minimise risk and lower operating costs of existing and newly constructed highway infrastructure. However, a comprehensive survey conducted across 56 countries by IRF’s Asset Management Committee has revealed that progress is uneven. A majority of survey respondents indic
  • Major new roads for Morocco in 2024
    January 8, 2024
    Major new road works are planned for Morocco in 2024.