Skip to main content

Egis has been awarded a major Turkish highway deal

Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus. OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish
June 25, 2013 Read time: 2 mins
The completion of the Gebze-İzmir highway will help improve traffic flow and reduce peak time congestion in the busy port city
2643 Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (3337 KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus.

OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish companies: 3338 Nurol İnşaat ve Ticaret; Özaltın İnşaat Ticaret ve Sanayi; 3340 Makyol İnşaat Sanayi Turizm ve Ticaret; 4149 Yüksel İnşaat; 3342 Göçay İnşaat Taahhüt ve Ticaret; and one Italian company, 1324 Astaldi. After a competitive bidding process, Egis was selected by OTOYOL as its operation partner.

The Gebze-İzmir Project is a tolled highway project procured by KGM under a build, operate and transfer (BOT) model. This is the largest BOT project in Turkey to date. It includes 420km of highway (2x3 lanes) between Gebze (on the North shore of İzmit Bay) and İzmir, as well as a 3km suspension bridge crossing İzmit bay, three tunnels with a total length of 6km and 20 toll stations. The project will be implemented in two phases. The first phase from Gebze to km 58 will include the 3km Izmit bay suspension bridge which is one of the longest suspension bridges in the world by the length of central span

For more information on companies in this article

Related Content

  • China opens record-breaking bridge
    May 8, 2012
    China has opened the world's longest bridge over water, the 41.58km Jiaozhou Bay Bridge, which is said to have cost well over US$2 billion to build. It links the eastern port city of Qingdao to Huangdao Island across Jiaozhou Bay and is 4km longer than the previous longest bridge over water, the Lake Pontchartrain Causeway in Louisiana, USA. Opened in June, 2011 after four years of construction, the link is expected to carry some 30,000 vehicle/day and will reduce travel time by 30 minutes, although it is o
  • Roads a priority in Oman’s $14.8bn infrastructure spend
    May 29, 2013
    An upcoming summit will look at opportunities offered by Oman’s infrastructure plans. Oman is planning to spend some US$14.8 billion on infrastructure in the coming years. The figure, almost half of the country’s 8th Five-Year Development Plan for 2011-2015, has been earmarked for overhauling roads, ports and airports with the objective to link the three modes of transport to improve interconnectivity. Oman’s huge infrastructure will include numerous road projects, bridge structures, tunnel constructions an
  • Talks continue for 2025 Gordie Howe opening
    January 18, 2023
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • IL&FS get LoI for US$263.9mn Kiratpur Ner Chowk Expressway contract
    March 15, 2013
    Kiratpur Ner Chowk Expressway has given IL&FS Engineering Services (IL&FS) a letter of intent (LoI) for an engineering, procurement and construction (EPC) contract in India worth US$263.9 million (INR 14.36bn). Under the deal, IL&FS will undertake a scope of work including minor bridges, five tunnels, 18 major bridges, toll plazas, 67.3km of road work and related infrastructure. The expressway project includes the EPC contract as well as expanding the Kiratpur Ner Chowk section of the National Highway 21 in