Skip to main content

Egis has been awarded a major Turkish highway deal

Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus. OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish
June 25, 2013 Read time: 2 mins
The completion of the Gebze-İzmir highway will help improve traffic flow and reduce peak time congestion in the busy port city
2643 Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (3337 KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus.

OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish companies: 3338 Nurol İnşaat ve Ticaret; Özaltın İnşaat Ticaret ve Sanayi; 3340 Makyol İnşaat Sanayi Turizm ve Ticaret; 4149 Yüksel İnşaat; 3342 Göçay İnşaat Taahhüt ve Ticaret; and one Italian company, 1324 Astaldi. After a competitive bidding process, Egis was selected by OTOYOL as its operation partner.

The Gebze-İzmir Project is a tolled highway project procured by KGM under a build, operate and transfer (BOT) model. This is the largest BOT project in Turkey to date. It includes 420km of highway (2x3 lanes) between Gebze (on the North shore of İzmit Bay) and İzmir, as well as a 3km suspension bridge crossing İzmit bay, three tunnels with a total length of 6km and 20 toll stations. The project will be implemented in two phases. The first phase from Gebze to km 58 will include the 3km Izmit bay suspension bridge which is one of the longest suspension bridges in the world by the length of central span

For more information on companies in this article

Related Content

  • BMO Entreprenør wins Vestland bridges deal
    March 22, 2024
    The work, in western Norway, includes concrete rehabilitation, steel surface-treatment, removal and installation of bridge railings and moisture insulation.
  • Colombia: Toyo Tunnel award to be made in September
    July 15, 2015
    The contract award for Columbia’s 9.75km Toyo Tunnel project will be made on September 28, according to Columbian media. The tunnel, costing almost US$760, will be part of a new 39km road between Santa Fe de Antioquia and Canasgordas. World Highways reported in January that the central government will contribute $216 million towards the project, the regional government of Antioquia department will contribute $337 million and the Medellin city government will pitch in with $212 million. Columbia’s N
  • Serbian roads to get Chinese funding
    November 28, 2012
    Talks between the Chinese Development Bank and the Serbian Government could result in €400-€450 million of Chinese funding for Serbian highway projects. The Danube coast and the Corridor 11 projects are among those earmarked for a potential cash boost. Serbia’s Ministry for Transport (MOT) is also in talks with Chinese partners about other highway builds including100km of the Belgrade-Cacak, Belgrade-Obrenovac, Preljina-Ljig and Lajkovac-Ljig routes, as well as the 100km Pojate-Preljina project. China Road
  • Concession tender for Brazilian bridge
    December 8, 2014
    Brazil’s Transport Ministry is putting the concession contract to maintain the Rio-Niterói bridge in Rio de Janeiro out to tender. The present 20-year maintenance contract for the bridge held by Ponte will run out in May 31st 2015, reports Business News Americas. The new concession deal will involve maintaining the structure as well as building an underpass underneath Renascença square in Niterói. Construction of the 13.3km pre-stressed concrete structure commenced in 1968 and was completed in 1974, at whic