Skip to main content

E&E Event 2018 Berlin: an asphalt industry fit for purpose

Exhibition space is now sold out for the E&E Event 2018 – Euroasphalt & Eurobitume - coming to Berlin, June 14-15. But early registration for a discount is still available, however the deadline is fast approaching – April 16. The finalised programme will soon be published for the E&E Event 2018 that will focus on the preparations needed by the asphalt industry to ensure it is fit for purpose in the future.
April 3, 2018 Read time: 2 mins
The 100-year-old architectural delight of Berlin’s Wasserwerk, now an event and networking venue that will be part of the E&E Event 2018 in June
Exhibition space is now sold out for the E&E Event 2018 – Euroasphalt & Eurobitume - coming to Berlin, June 14-15.


But early registration for a discount is still available, however the deadline is fast approaching – April 16.

The finalised programme will soon be published for the E&E Event 2018 that will focus on the preparations needed by the asphalt industry to ensure it is fit for purpose in the future.

Important strategic issues will be explored, some of which were highlighted in the E&E Congress 2016. These include the increasingly stringent economic aspects of supply and demand, the growing environmental issues over highway construction and use, health and safety within the sector and, as ever, the latest technologies and equipment.

The facilitator will again be Katrina Sichel, back moderating after leading the successful E&E Event 2016. This year’s event will be based on a completely new format. The programme will be centred around a series of professionally-facilitated sessions using debates, workshops and information exchanges, supported by online tools that allow attendees to have their own say.

Attendees will hear about road financing initiatives, the European Union’s Eurovignette Directive as well as ideas on who pays and for what. The latest low-rolling resistance asphalt will be examined, along with more sustainable pavements and how to reduce CO2 emissions along highways.

The venue is Vienna House, Andel’s Berlin and a networking dinner - included in the registration fee – will be held within the historical industrial architecture of the 100-year-old pumping station, Wasserwerk Berlin. More information about Wasserwerk Berlin can be found at the website: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.wasserwerk-berlin.de false http://www.wasserwerk-berlin.de/ false false%>

For more information to register for the early-bird discount, visit the E&E Event 2018 website: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.eeevent2018.org false http://www.eeevent2018.org/ false false%>

Related Content

  • It’s a deadly business for contractors painting road markings
    August 4, 2015
    Animal welfare groups in the Republic of Ireland are angry over the apparent insensitive act by a road making contractor who painted a yellow line over a dead cat on the side of the highway. A report by Irish newspapers quoted one person saying it was “shameful” and “nobody cared enough to move this poor cat who had been killed by a car and the line was painted over it”.
  • Cummins launches SCR only Stage IV/Tier 4 engines
    January 6, 2017
    Cummins used bauma to reveal the QSF3.8 – a four-cylinder engine platform delivering a power range of 63-89kW – which is ready to meet Stage IV/Tier 4 Final emissions regulations. Using only SCR for its exhaust after-treatment process, the QSF3.8 avoids the need for either DOC or DPF as a result of using a high-efficiency catalyst to convert oxides of nitrogen at lower exhaust temperatures while requiring only low doses of DEF, said the company.
  • Cummins launches SCR only Stage IV/Tier 4 engines
    April 16, 2013
    Cummins used bauma to reveal the QSF3.8 – a four-cylinder engine platform delivering a power range of 63-89kW – which is ready to meet Stage IV/Tier 4 Final emissions regulations. Using only SCR for its exhaust after-treatment process, the QSF3.8 avoids the need for either DOC or DPF as a result of using a high-efficiency catalyst to convert oxides of nitrogen at lower exhaust temperatures while requiring only low doses of DEF, said the company.
  • World Bank finances Uzbekistan road development
    July 7, 2015
    The World Bank will grant Uzbekistan a US$200 million loan for 25 years, including a grace period of five years. The funds will go towards the $240 million Regional Roads Development project that is scheduled to be completed by 2021, according to UzDaily.uz. Uzbekistan’s government also reported that around 117km roads were built in the first half of this year.