Skip to main content

EcoMix concrete plant gets INTERMAT launch

Using Ammann’s AS1 plant control system, the EcoMix concrete plant combines accurate measuring equipment and comprehensive process control to guarantee perfect, repeatable results, claimed Ammann. The galvanised steel support structure is light, warp resistant and also suitable for areas of increased seismic activity, it is claimed. The EcoModule is equipped with the company’s tried and tested Amix twinshaft paddle mixer and is pre-assembled and tested at the factory.
April 4, 2012 Read time: 1 min
Using 3764 Ammann Group’s AS1 plant control system, the EcoMix concrete plant combines accurate measuring equipment and comprehensive process control to guarantee perfect, repeatable results, claimed Ammann.

The galvanised steel support structure is light, warp resistant and also suitable for areas of increased seismic activity, it is claimed. The EcoModule is equipped with the company’s tried and tested Amix twinshaft paddle mixer and is pre-assembled and tested at the factory.

Combined with cement silos of up to 800tonnes capacity and aggregate silos up to 750m3, output of the EcoMix plant is up to 190m3 of hardened concrete/hour.

Optional heating or cooling equipment is energy-efficient and makes the plant suitable for any climate zone. With low dust and noise emissions, Ammann reckoned The EcoMix is also suitable for urban areas.

%$Linker: External 0 0 0 oLinkExternal www.ammann-group.com Ammann false http://www.ammann-group.com/ false false%>

Hall: 5B Stand: F028

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

Related Content

  • Liebherr shows wheeled loaders at INTERMAT
    February 7, 2012
    L576 and L580 wheeled loaders have been given revised engines with clean emissions technology and tweaked outputs. It means the L576 delivers 205kW for its 10.5 litre six-cylinder engine, which is equipped with common rail fuel injection, DOC and DPF.
  • Golden moment at INTERMAT ribbon cutting ceremony
    January 6, 2017
    Monsieur Bernard Accoyer, the president of the French National Assembly, officially opened INTERMAT 2012 with a traditional ribbon cutting ceremony. Equipped with gold-plated scissors, M Accoyer paused for the media before slicing through the tricolour ribbon on his way to an extensive 90-minute tour of the show’s exhibition halls, to savour all that the construction industry has to offer.
  • Golden moment at INTERMAT ribbon cutting ceremony
    April 17, 2012
    Monsieur Bernard Accoyer, the president of the French National Assembly, officially opened INTERMAT 2012 with a traditional ribbon cutting ceremony. Equipped with gold-plated scissors, M Accoyer paused for the media before slicing through the tricolour ribbon on his way to an extensive 90-minute tour of the show’s exhibition halls, to savour all that the construction industry has to offer.
  • Hydrokit launches wagon pulling system at INTERMAT 2012
    January 6, 2017
    New from Hydrokit is a wagon pulling system for use in applications such as quarries.