Skip to main content

DORR to build first suspension bridge in Samut Prakan, Thailand in 2016

In 2016, Thai Department of Rural Roads (DORR) is going to start the US$1.64 billion (THB 49bn) 36-month construction of Thailand's first suspension bridge between Samut Prakan's Muang-Phra Samut Chedi districts. According to Deputy Transport Minister, Prasert Chanruangthong, the suspension bridge will span 1km across the Chao Phraya River. Upon completion, the new bridge is anticipated to ease traffic woes in Samut Prakan by 20%. The bridge project is progressing to the detailed design and environmental im
February 25, 2013 Read time: 1 min
In 2016, Thai Department of Rural Roads (DORR) is going to start the US$1.64 billion (THB 49bn) 36-month construction of Thailand's first suspension bridge between Samut Prakan's Muang-Phra Samut Chedi districts.

According to Deputy Transport Minister, Prasert Chanruangthong, the suspension bridge will span 1km across the Chao Phraya River.

Upon completion, the new bridge is anticipated to ease traffic woes in Samut Prakan by 20%. The bridge project is progressing to the detailed design and environmental impact assessment, after completing its initial design.

Besides the bridge, DORR will also construct a new linking road that will stretch 57km between Samut Prakan and Samut Sakhon's Muang district.

The combined land and expropriation project cost is expected to reach THB 7.9bn.

Related Content

  • Moscow’s first toll road is being planned
    May 21, 2013
    In Russia’s capital Moscow the finishing touches are being put to a plan to construct the city’s first tolled link. The northern relief road for Kutuzovsky prospect is expected to cost US$1.91 billion to build and will stretch a distance of 10.3km. The tender process for the concession package is being prepared at present and is expected to open for bids shortly. Once complete the new link will connect Moscow’s business centre with Molodogvardeyskaya junction. Meanwhile in the Russian city of Tula, some 193
  • THG Verk starts Ölfusá Bridge work
    December 9, 2024
    THG Verk - in Icelandic, ÞG Verk – is the main contractor for the 330m-long cable-stayed bridge that will cross the Ölfusá River, Iceland’s biggest.
  • Montreal’s Champlain Bridge superstructure deal signed with Canam-Bridge
    May 22, 2015
    Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America. The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium con
  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.