Skip to main content

DORR to build first suspension bridge in Samut Prakan, Thailand in 2016

In 2016, Thai Department of Rural Roads (DORR) is going to start the US$1.64 billion (THB 49bn) 36-month construction of Thailand's first suspension bridge between Samut Prakan's Muang-Phra Samut Chedi districts. According to Deputy Transport Minister, Prasert Chanruangthong, the suspension bridge will span 1km across the Chao Phraya River. Upon completion, the new bridge is anticipated to ease traffic woes in Samut Prakan by 20%. The bridge project is progressing to the detailed design and environmental im
February 25, 2013 Read time: 1 min
In 2016, Thai Department of Rural Roads (DORR) is going to start the US$1.64 billion (THB 49bn) 36-month construction of Thailand's first suspension bridge between Samut Prakan's Muang-Phra Samut Chedi districts.

According to Deputy Transport Minister, Prasert Chanruangthong, the suspension bridge will span 1km across the Chao Phraya River.

Upon completion, the new bridge is anticipated to ease traffic woes in Samut Prakan by 20%. The bridge project is progressing to the detailed design and environmental impact assessment, after completing its initial design.

Besides the bridge, DORR will also construct a new linking road that will stretch 57km between Samut Prakan and Samut Sakhon's Muang district.

The combined land and expropriation project cost is expected to reach THB 7.9bn.

Related Content

  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.
  • UK’s Mersey Gateway Project team invites final tenders
    February 26, 2013
    The team behind what is set to be one of the UK’s largest infrastructure initiatives in the next few years has invited final tenders from the three shortlisted bidders competing to deliver it. The Mersey Gateway Project bidders have been asked to submit their tenders on behalf of Halton Borough Council by 10 April 2013, and an announcement about the identity of the preferred bidder is due in June 2013. This will allow the team behind the North West England-based project to sign a contract and begin construc
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • Davao City tunnel work accelerated
    November 18, 2022
    The twin-tube 2.3km-long tunnel will be the longest in the Philippines and is being constructed by Filipino and Japanese engineers.