Skip to main content

DORR to build first suspension bridge in Samut Prakan, Thailand in 2016

In 2016, Thai Department of Rural Roads (DORR) is going to start the US$1.64 billion (THB 49bn) 36-month construction of Thailand's first suspension bridge between Samut Prakan's Muang-Phra Samut Chedi districts. According to Deputy Transport Minister, Prasert Chanruangthong, the suspension bridge will span 1km across the Chao Phraya River. Upon completion, the new bridge is anticipated to ease traffic woes in Samut Prakan by 20%. The bridge project is progressing to the detailed design and environmental im
February 25, 2013 Read time: 1 min
In 2016, Thai Department of Rural Roads (DORR) is going to start the US$1.64 billion (THB 49bn) 36-month construction of Thailand's first suspension bridge between Samut Prakan's Muang-Phra Samut Chedi districts.

According to Deputy Transport Minister, Prasert Chanruangthong, the suspension bridge will span 1km across the Chao Phraya River.

Upon completion, the new bridge is anticipated to ease traffic woes in Samut Prakan by 20%. The bridge project is progressing to the detailed design and environmental impact assessment, after completing its initial design.

Besides the bridge, DORR will also construct a new linking road that will stretch 57km between Samut Prakan and Samut Sakhon's Muang district.

The combined land and expropriation project cost is expected to reach THB 7.9bn.

Related Content

  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
  • Colorado river bridge relieves congestion
    February 7, 2012
    Built in the shadow of the Hoover Dam, a new bridge is set to takes its place as another major tourist attraction. Patrick Smith reports
  • At least US$5 billion for Oregon-Washington bridge
    October 2, 2024
    Building the new I-5 Oregon-Washington bridge will cost at least US$5 billion.
  • Paraguay to tender first bi-oceanic section: Carmelo Peralta and Loma Plata
    November 3, 2015
    Paraguay’s Ministry of Public Works and Communications will tender for the first part of the bi-oceanic corridor project this month. Work involves paving on the 255km section between Carmelo Peralta, Cruce Centinela and Loma Plata in the western region of the country under a turnkey format. The first section of the road is expected to require an investment of around US$280 million. The second stage of the project that will connect Paraguay with Argentina and cost $340 million. Work include paving