Skip to main content

Doosan Infracrore launches its innovative smart construction solution

Doosan Infracore has launched new XiteCloud smart construction solution, initially in South Korea.
By Guy Woodford June 18, 2020 Read time: 2 mins
Doosan's XiteCloud solution encompasses the entire construction process including drone-based surveys

The construction equipment provider says XiteCloud is the first step towards the commercialisation of Concept-X, the company's integrated unmanned and automated control solution, first unveiled in 2019.

XiteCloud is designed to maximise productivity by incorporating complex 3D drone construction surveys and earthwork calculations into a cloud platform, allowing them to be completed in one to two days. Following the launch in South Korea, Doosan Infracore intends to roll out XiteCloud in international markets including Europe in the near future.

The company says the rollout of XiteCloud will enable it to further expand its business portfolio into the field of construction site management, to complement its existing operations in manufacturing and sales of construction equipment.

XiteCloud is designed to enable a contractor to manage multiple tasks such as surveys, terrain analysis, equipment operation and construction management on a single platform, thereby reducing construction costs and saving time while increasing work accuracy, which in turn raises productivity.

The solution can digitise earthwork site information into three dimensions and can also analyse rock formations. Since XiteCloud is cloud-based, Doosan Infracore says this makes it easy for stakeholders, including contractors and clients, to join forces and manage the progress of a given project together.

Even on unfriendly terrain such as steep slopes and cliffs, XiteCloud calculates exact work volumes using advanced drone-based surveys. By analysing vast amounts of field data quickly and accurately, XiteCloud completes construction surveys and earthwork calculations, which typically take as long as two weeks, within a day or two.

At one urban redevelopment site in a metropolitan area, the XiteCloud platform analysed and calculated the work volume of rock formations that were discovered only after the project had kicked off, thus enabling the client and the contractor to reach an agreement on adjusting the construction period. The visualised 3D data enabled them to come to an agreement about additional construction costs as well as the extension of the construction period.

"Concept-X is a comprehensive control solution that encompasses the entire construction process, including drone-based surveys, automatic analysis of topographical data, construction planning, and unmanned construction machinery and control centre operations," said an executive of Doosan Infracore. "We will launch various solutions in stages even before the full-scale commercialisation of Concept-X, with the launch of XiteCloud marking the very first step towards that goal."

For more information on companies in this article

Related Content

  • Piling accurately with Trimble’s new tool
    June 10, 2019
    Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods. “Engineered for ease of use, Trim
  • Sandvik’s DT1131i jumbo and iSURE software in Iceland and Norway
    August 14, 2019
    Sandvik’s DT1131i three-boom, electro-hydraulic jumbo, iSURE tunnel management software and the latest drill bit hardware were recently put to the test in Iceland and Norway* Czech contractor Metrostav recently achieved 105m of tunnel excavation in a record-breaking six days. But it will be consistent performance and progress that will see Iceland’s Dyrafjordurgong Tunnel in the remote Westfjords region open on time and on budget. The 5.3km Dyrafjordurgong Tunnel is costing around €69 million and due
  • Rapid adoption of GPS machine control
    April 5, 2012
    The high sophistication of GPS machine control systems has resulted in a fast pace of technological advancement. The three major players in the machine control sector, Leica Geosystems, Topcon and Trimble have all made major gains in recent years. The sophistication of the latest systems can combine satellite position data from the GPS and GLONASS networks with information from total stations to provide precise, high speed machine operation. Further more the firms have also prepared themselves for the intro
  • Efficient stockpile and site monitoring
    October 23, 2017
    Effective monitoring of aggregates stockpiles as well as face excavation can deliver greater quarrying efficiency. One of the latest innovations in quarrying is the use of drones, which provide major benefits for optimising operations. The use of affordable drone hardware and software solutions can help reduce stockpile inventory time by as much as 70%. Through the recent partnership between Trimble and Propeller, drone data can now be an everyday tool in quarries by proving a transformational impact