Skip to main content

Doka showcases Cut&Cover tunnel construction solution

Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
February 7, 2013 Read time: 2 mins
Doka says Doka CC is its first system specifically for cut and cover tunnel builds
Austrian firm 203 Doka will be showcasing at 688 Bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely.

Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade steel members is said to have enabled the weight to be considerably reduced. These attributes are said to make for quick system set-up and great ease of use on the site.

The Doka CC system provides, says Doka, a high degree of safety against base failure. Safe shoring is possible whenever needed, regardless of the type of foundation. Another benefit claimed by Doka when using this variable tunnel formwork system is that it is geometry-independent and can be adapted to even the most challenging shapes and routes of a tunnel.

The tunnel formwork traveller has an all-hydraulic wheel system that is said to allow it to be three-dimensionally aligned with millimetre precision, without needing to be set down between alignments. Even gradients of as much as 10% are claimed to be easily negotiated. A slide-type solution for the new stop-end system saves time when stripping out, and the integral platform system and ladderways are said to provide a high level of safety.

Other Doka formwork solutions for transport infrastructure at bauma are the firm’s composite forming carriage, Bridge formwork ParaTop, and DokaShore.

The formwork specialists are exhibiting at bauma under the slogan: ‘Pathbreaking. Beyond Solutions’.

Stand: FGN.N817

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Doka.com www.Doka.com false http://www.doka.com/ false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Machinery/material control with Ma-estro’s Transport Q
    January 6, 2017
    Italian company Ma-estro has developed the Transport Q control system for the control of material and machinery movement on large road building sites and in quarries. It says that on building sites characterised by highly dynamic situations, the main problem has been that of tracing the movements of equipment and materials entering and leaving the site, and doing this automatically, safely and accurately. “A control system entrusted to a number of persons in continuous rotation, where external personnel pay
  • Machinery/material control with Ma-estro’s Transport Q
    February 26, 2013
    Italian company Ma-estro has developed the Transport Q control system for the control of material and machinery movement on large road building sites and in quarries. It says that on building sites characterised by highly dynamic situations, the main problem has been that of tracing the movements of equipment and materials entering and leaving the site, and doing this automatically, safely and accurately. “A control system entrusted to a number of persons in continuous rotation, where external personnel pay
  • D-TEC launches new sorting and demolition grapples
    January 6, 2017
    D-TEC has launched its new sorting and demolition grapples for the Asian market during bauma China 2012. The new range from the Dutch company is available for excavators from 0.7tonnes up to 50tonnes. Said to be made in its state-of-the-art production facility, the new D-TEC grapples feature Hardox wear parts; are low weight; have maximum load force; and offer easy maintenance for the operator. They are made to ISO 9001 standards.
  • D-TEC launches new sorting and demolition grapples
    November 30, 2012
    D-TEC has launched its new sorting and demolition grapples for the Asian market during bauma China 2012. The new range from the Dutch company is available for excavators from 0.7tonnes up to 50tonnes. Said to be made in its state-of-the-art production facility, the new D-TEC grapples feature Hardox wear parts; are low weight; have maximum load force; and offer easy maintenance for the operator. They are made to ISO 9001 standards.