Skip to main content

Doka showcases Cut&Cover tunnel construction solution

Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
February 7, 2013 Read time: 2 mins
Doka says Doka CC is its first system specifically for cut and cover tunnel builds
Austrian firm 203 Doka will be showcasing at 688 Bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely.

Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade steel members is said to have enabled the weight to be considerably reduced. These attributes are said to make for quick system set-up and great ease of use on the site.

The Doka CC system provides, says Doka, a high degree of safety against base failure. Safe shoring is possible whenever needed, regardless of the type of foundation. Another benefit claimed by Doka when using this variable tunnel formwork system is that it is geometry-independent and can be adapted to even the most challenging shapes and routes of a tunnel.

The tunnel formwork traveller has an all-hydraulic wheel system that is said to allow it to be three-dimensionally aligned with millimetre precision, without needing to be set down between alignments. Even gradients of as much as 10% are claimed to be easily negotiated. A slide-type solution for the new stop-end system saves time when stripping out, and the integral platform system and ladderways are said to provide a high level of safety.

Other Doka formwork solutions for transport infrastructure at bauma are the firm’s composite forming carriage, Bridge formwork ParaTop, and DokaShore.

The formwork specialists are exhibiting at bauma under the slogan: ‘Pathbreaking. Beyond Solutions’.

Stand: FGN.N817

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Doka.com www.Doka.com false http://www.doka.com/ false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Sleipner’s highlights system for moving excavators
    February 13, 2013
    Sleipner will explain the principle behind its “revolutionary method to improve the overall productivity in open-pit mines, quarries and construction sites.” The improvement is based on moving excavators around the site much faster than before, and additionally the Sleipner method saves time and money and considerably increases the excavators’ life, says the company.
  • Trimble acquire software solutions suite from Premap.com
    January 6, 2017
    U.S. telematics giant Trimble has acquired a suite of software solutions from Penmap.com of Bradford, England. Penmap.com’s solutions include both office and field data collection software specifically designed for the cadastral and surveying markets. The acquisition enables Trimble to further cater for local application requirements and customer needs by providing complete customised surveying software solutions for the cadastral market.
  • Trimble acquire software solutions suite from Premap.com
    February 21, 2013
    U.S. telematics giant Trimble has acquired a suite of software solutions from Penmap.com of Bradford, England. Penmap.com’s solutions include both office and field data collection software specifically designed for the cadastral and surveying markets. The acquisition enables Trimble to further cater for local application requirements and customer needs by providing complete customised surveying software solutions for the cadastral market.
  • John Deere Power Systems completes engine line-up
    January 6, 2017
    John Deere Power Systems used bauma to complete its engine line-up for Tier 4 Final/Stage IV emissions regulations. This included the arrival of the PowerTechTM PWL 4.5L engine, which meets emissions regulations without a diesel particulate filter (DPF). Spanning outputs from 63-104kW, this four-cylinder, 4.5litre engine offers reduced cost and improves engine packaging by eliminating the DPF, said Deere. However, the engine uses selective catalytic reduction (SCR), a diesel oxidation catalyst (DOC) and coo