Skip to main content

Doka showcases Cut&Cover tunnel construction solution

Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
February 7, 2013 Read time: 2 mins
Doka says Doka CC is its first system specifically for cut and cover tunnel builds
Austrian firm 203 Doka will be showcasing at 688 Bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely.

Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade steel members is said to have enabled the weight to be considerably reduced. These attributes are said to make for quick system set-up and great ease of use on the site.

The Doka CC system provides, says Doka, a high degree of safety against base failure. Safe shoring is possible whenever needed, regardless of the type of foundation. Another benefit claimed by Doka when using this variable tunnel formwork system is that it is geometry-independent and can be adapted to even the most challenging shapes and routes of a tunnel.

The tunnel formwork traveller has an all-hydraulic wheel system that is said to allow it to be three-dimensionally aligned with millimetre precision, without needing to be set down between alignments. Even gradients of as much as 10% are claimed to be easily negotiated. A slide-type solution for the new stop-end system saves time when stripping out, and the integral platform system and ladderways are said to provide a high level of safety.

Other Doka formwork solutions for transport infrastructure at bauma are the firm’s composite forming carriage, Bridge formwork ParaTop, and DokaShore.

The formwork specialists are exhibiting at bauma under the slogan: ‘Pathbreaking. Beyond Solutions’.

Stand: FGN.N817

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Doka.com www.Doka.com false http://www.doka.com/ false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Tesab 1200TC tracked cone crusher with Cat C13 engine
    March 26, 2013
    New to the Tesab range of crushing and screening equipment is the 1200TC tracked cone crusher, a development that completes the company’s range of crushing and screening equipment. The 1,200mm diameter cone crusher unit is a well proven design having established itself in static applications in Scandinavia and Australasia.
  • Komatsu is upgrading its well-proven HD785 rigid truck
    February 12, 2013
    Higher performance is claimed for Komatsu’s Dash 7 version of its well-proven HD785 rigid dump truck, which offers a heaped capacity of 60m3. The 91tonne capacity HD785-7 is matched to Komatsu’s PC1250 and PC2000 excavators, and WA800 and WA900 wheel loaders. The new version of the truck is said to be more powerful than the previous generation machine, with drive from a Komatsu SAA12V140E-3 diesel delivering 1,178kW.
  • Less damage for a low cost with SKF’s new development
    January 6, 2017
    More machines, both mobile and stationary, are using centralised lubrication which helps to ensure that all points receive the required amount of lubrication, as lack of it could result in expensive bearing damage. Escaping lubricant can have a significant negative impact on the environment, and can also incur expensive clean-up and disposal costs. SKF has developed the Lincoln Hose Connection Control, which can be operated between -50 to +70 OC, this unit shows immediately and reliably when damage occurs.
  • Less damage for a low cost with SKF’s new development
    February 13, 2013
    More machines, both mobile and stationary, are using centralised lubrication which helps to ensure that all points receive the required amount of lubrication, as lack of it could result in expensive bearing damage. Escaping lubricant can have a significant negative impact on the environment, and can also incur expensive clean-up and disposal costs. SKF has developed the Lincoln Hose Connection Control, which can be operated between -50 to +70 OC, this unit shows immediately and reliably when damage occurs.