Skip to main content

Doka and MFE in Malaysia join forces

Doka's purchase of MFE Formwork Technology, based in Kuala Lumpur, comes after its acquisition early last year of US-based scaffolding manufacturer and rental business AT-PAC.
By David Arminas March 11, 2024 Read time: 2 mins
MFE’s monolithic formwork systems, decking systems, column systems and self-climbing platforms, are all designed at the company’s headquarters in Kuala Lumpur, Malaysia

MFE Formwork Technology, a provider of monolithic aluminium formwork and based in Malaysia, is now part of Doka, part of the global Umdasch Group.

Doka says that together they are now the major player in the Asia-Pacific region for customers looking for a solution from a single source.

Doka, based in Austria, has earmarked the Pacific and North American regions as a growth market for the company, explained Robert Hauser, chief executive of Doka. “We have been in a sales partnership for many years, which we are now taking to the next level. MFE is an experienced company with great expert know-how.”

Founded in 1991 and employing more than 2,200 people, MFE’s monolithic formwork allows elements such as slabs and walls to be formed in a single pour, resulting in a seamless, jointless structure. This technique is particularly suited to projects with less complex and repetitive geometric requirements.

Doka, on the other hand, specialises in steel formwork in combination with timber and is characterised by solutions in the large-scale sector. Hauser said MFE gains Doka’s extensive global sales network and is active in over 60 countries with more than 170 locations.

MFE’s monolithic formwork systems, decking systems, column systems and self-climbing platforms, are all designed at the company’s headquarters in Kuala Lumpur, Malaysia, said Pat Gorham, chief executive of MFE. “This partnership further fortifies our ability to cater to our clients’ needs and we’re incredibly enthusiastic about the future prospects that lie ahead.”

Early last year, Doka completed its 100% acquisition of the US-based scaffolding manufacturer and rental business AT-PAC. Both companies initially partnered in 2020 to provide comprehensive global construction site solutions. Doka says that the acquisition positions Doka as a single source for formwork and scaffolding for the global construction industry and strengthens the company’s new global business segment called Industrial Scaffolding.

For more information on companies in this article

Related Content

  • Doka puts the ‘Y’ in Turkey
    July 8, 2020
    The 600m cable-stayed Kömürhan Bridge rises around 165m over eastern Turkey’s Karakaya Dam Lake and is part of the Malatya-Elazig State Highway. The bridge is the fourth single-pylon cable-stayed bridge in the world and is due to open in July.
  • PERI's tall order in Mexico
    February 14, 2012
    The Baluarte Bridge (Puente Baluarte), part of a major highway project, ranks among the most outstanding infrastructure projects ever constructed in Mexico.
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl