Skip to main content

Discussions on next stage of engine emissions

Discussions on the next stage of engine emissions controls for Europe will commence in due course. This will follow the completion of the EC Consultation process on Stage V Emissions, which is being closed shortly. The consultation on the next round of changes to the engine emissions directive has been taking key topics under consideration. This is reviewing possible extensions to the legislation to include large and small engines and more petrol engines. Setting new stages including a Stage V with particle
March 15, 2013 Read time: 1 min
Discussions on the next stage of engine emissions controls for Europe will commence in due course. This will follow the completion of the EC Consultation process on Stage V Emissions, which is being closed shortly. The consultation on the next round of changes to the engine emissions directive has been taking key topics under consideration. This is reviewing possible extensions to the legislation to include large and small engines and more petrol engines. Setting new stages including a Stage V with particle counting is also being considered, along with in-service conformity checking, the use of alternative fuels and potential modifications to the flexibility scheme. Equipment manufacturing associations are currently working on their input to the 2465 European Commission consultation.

For more information on companies in this article

Related Content

  • Bitumen technology: counting carbon emissions from road works
    March 13, 2024
    This month we look at accurate carbon counting, a biobinder that does not come at a premium and efforts to increase recycled content - Kristina Smith reports
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Doosan launches the DX300LC-5 excavator
    April 30, 2015
    Doosan has launched the 30tonne DX300LC-5 Stage IV compliant crawler excavator, providing greatly improved performance over the LC-3 Stage IIIB model. Bucket, arm and swing forces in the DX300LC-5 remain the same as the Stage IIIB model, but the drawbar pull has been sharply increased by 8%. The operating weight of the DX300LC-5 has increased 900kg, resulting in a lifting capacity increase of 1% over the front and 5% over the side. The new machine’s styling allows increased driver comfort and vehicu
  • WSP to update the UK’s cycling infrastructure design guidance
    June 26, 2018
    Engineering services provide WSP has been appointed by the UK’s Department for Transport to revise and update design guidance for cycling infrastructure. Updating design criteria is a key aspect within the government’s Cycling and Walking Investment Strategy. The goal is to increase cycling and walking and by making them a natural choice for shorter journeys or as part of a longer trip. “It is hoped that this refresh will ensure that the guidance aligns to current legislation and will provide best practic