Skip to main content

Discussions on next stage of engine emissions

Discussions on the next stage of engine emissions controls for Europe will commence in due course. This will follow the completion of the EC Consultation process on Stage V Emissions, which is being closed shortly. The consultation on the next round of changes to the engine emissions directive has been taking key topics under consideration. This is reviewing possible extensions to the legislation to include large and small engines and more petrol engines. Setting new stages including a Stage V with particle
March 15, 2013 Read time: 1 min
Discussions on the next stage of engine emissions controls for Europe will commence in due course. This will follow the completion of the EC Consultation process on Stage V Emissions, which is being closed shortly. The consultation on the next round of changes to the engine emissions directive has been taking key topics under consideration. This is reviewing possible extensions to the legislation to include large and small engines and more petrol engines. Setting new stages including a Stage V with particle counting is also being considered, along with in-service conformity checking, the use of alternative fuels and potential modifications to the flexibility scheme. Equipment manufacturing associations are currently working on their input to the 2465 European Commission consultation.

For more information on companies in this article

Related Content

  • CECE Summit 2020: a shift in mindset needed
    January 29, 2020
    Digitalisation and sustainability focused minds at the recent biennial CECE Summit in Brussels
  • Wirtgen’s new recycling technology
    June 22, 2018
    Wirtgen is offering an array of new technologies for milling, recycling and stabilising applications. These are intended to boost accuracy, versatility and performance. A new milling drum assembly is offered that widens the range of applications that the Wirtgen W 150 CF/W 150 Cfi milling machines can handle. This redesigned assembly allows users to select an array of cutter drums, including a 1.8m-wide unit. According to the firm, the machines offer the highest power to weight ratio for their class, with d
  • Independent experts suggest interim Bay Bridge fix
    August 15, 2013
    The state Toll Bridge Program Oversight Committee (TBPOC) says it has received a report from the Federal Highway Administration (FHWA) in which the federal agency concludes that installing temporary seismic elements will make the new East Span of the San Francisco-Oakland Bay Bridge safe for traffic, and should be put in place as soon as possible. This FHWA plan involves inserting large steel plates, known as shims, into each of four bearings, improving their ability to safely distribute energy during an ea
  • CEMCO meets tough VSI crushing challenge
    September 25, 2013
    Quarry firm Blue Mountain Minerals is improving output quality and productivity following the installation of a new CEMCO crusher. The facility is located in the Sierra Nevada foothills in Northern California, around two hours’ drive to the south east of Sacramento. This quarry has been providing customers in California with a variety of limestone and dolomite products for more than 150 years. Blue Mountain is the largest producer of limestone products in northern California and provides quality materia