Skip to main content

Discussions on next stage of engine emissions

Discussions on the next stage of engine emissions controls for Europe will commence in due course. This will follow the completion of the EC Consultation process on Stage V Emissions, which is being closed shortly. The consultation on the next round of changes to the engine emissions directive has been taking key topics under consideration. This is reviewing possible extensions to the legislation to include large and small engines and more petrol engines. Setting new stages including a Stage V with particle
March 15, 2013 Read time: 1 min
Discussions on the next stage of engine emissions controls for Europe will commence in due course. This will follow the completion of the EC Consultation process on Stage V Emissions, which is being closed shortly. The consultation on the next round of changes to the engine emissions directive has been taking key topics under consideration. This is reviewing possible extensions to the legislation to include large and small engines and more petrol engines. Setting new stages including a Stage V with particle counting is also being considered, along with in-service conformity checking, the use of alternative fuels and potential modifications to the flexibility scheme. Equipment manufacturing associations are currently working on their input to the 2465 European Commission consultation.

For more information on companies in this article

Related Content

  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • Material transfer vehicles see advances
    July 9, 2020
    Material transfer vehicles offer a buffer between asphalt trucks and pavers, optimising flow, and new models coming to market offer improved performance