Skip to main content

dfsdf

sdfsdf
September 14, 2012 Read time: 1 min
1224 Google

The capture of User Persona information has allowed EIBS and Eastbourne BC to form user journeys and Wireframes (page types) for the website redevelopment project. These are defined and described in the section 3 below.

For more information on companies in this article

Related Content

  • Tunnel vision with TrafiBot camera
    November 26, 2024

    Flir has launched the closed circuit TrafiBot Dual AI multispectral camera system specifically to improve safety in tunnels and on bridges.

    Flir, part of Teledyne Technologies, noted that it is in tunnels and on bridge that where drivers are most at risk for hitting unseen objects or being trapped by fast-growing vehicle fires.

  • Skanska’s sophisticated satellite system saves fuel
    April 23, 2013
    Satellite vehicle tracking technology from Isotrak is helping Skanska UK’s utilities business save on fuel and be kinder to the environment by reducing emissions. Using the real time system to track the company’s mobile workforce on the road enables efficient vehicle management and provides detailed reporting on individual driving styles for each driver. This is said to have enabled Skanska UK, a leading utility infrastructure and asset management provider, covering telecommunications, gas, power and water
  • Airport expansion for the Maldives assisted by Trimble
    September 6, 2019
    An airport redevelopment and expansion project in the Maldives has been assisted by the use of technology from Trimble. In 2016 the Chinese firm Beijing Urban Construction Group (BUCG) was awarded the contract for the expansion of the Ibrahim Nasir International Airport on Hulhule island in the Maldives, which is part of the Indian Ocean island group. The massive US$440 million expansion and land reclamation work is intended to boost capacity at the Maldives Airport. BUCG has utilised Trimble field solu
  • Upgrades planned for key UK link
    July 14, 2014
    Work is now to go ahead on upgrading a key stretch of the A21 road in the UK. Contractor Balfour Beatty will handle the work to widen a stretch of the A21 between Tonbridge and Pembury and also improve the road, with it becoming a dual carriageway. The €87.55 million (£69.7 million) scheme forms part of a plan by the UK Government for a series of road improvements of €30.15 billion (£24 billion) by 2021. Advance work is expected to start in the third quarter of this year with the main construction activity