Skip to main content

dfsdf

sdfsdf
September 14, 2012 Read time: 1 min
1224 Google

The capture of User Persona information has allowed EIBS and Eastbourne BC to form user journeys and Wireframes (page types) for the website redevelopment project. These are defined and described in the section 3 below.

For more information on companies in this article

Related Content

  • HCME’s new ZX140W-5 wheeled loader gets bauma platform
    January 6, 2017
    In terms of productivity, comfort and safety, and easy maintenance, Hitachi Construction Machinery (Europe) (HCME) says its ZX140W-5 wheeled excavator being showcased at bauma delivers on every level. Described as an efficient performer on any job site, the ZX140W-5’s powerful new-generation 90.2kW Isuzu Stage IIIB-compliant engine is said to deliver higher productivity than the previous Zaxis-3 model with greater fuel efficiency. The HIOS III hydraulic system contributes to less fuel consumption. The machi
  • HCME’s new ZX140W-5 wheeled loader gets bauma platform
    February 8, 2013
    In terms of productivity, comfort and safety, and easy maintenance, Hitachi Construction Machinery (Europe) (HCME) says its ZX140W-5 wheeled excavator being showcased at bauma delivers on every level. Described as an efficient performer on any job site, the ZX140W-5’s powerful new-generation 90.2kW Isuzu Stage IIIB-compliant engine is said to deliver higher productivity than the previous Zaxis-3 model with greater fuel efficiency. The HIOS III hydraulic system contributes to less fuel consumption. The machi
  • Road trains project saves space as well as fuel
    February 23, 2012
    A high-tech European project involving cars could reduce fuel consumption by up to one-fifth as Patrick Smith reports. A new EU project, Sartre, is aimed at developing and testing technology for vehicles that can drive themselves in long road trains on motorways.
  • Financial setbacks beset Slovakia’s highway development
    June 12, 2012
    Slovakian highway company NDS says that construction of the 13km Turany-Hubova highway may not be started in 2012. The previous Transport Ministry plan was to call the tender for this stretch in summer 2012. However, the EC has not yet approved the construction of this highway, with questions surrounding the protected area in the Velka and Mala Fatra mountains. If Slovakia does not get this approval, the country might have to chose the second option, which includes the tunnel Korbelka. The EC's decision is