Skip to main content

dfsdf

sdfsdf
September 14, 2012 Read time: 1 min
1224 Google

The capture of User Persona information has allowed EIBS and Eastbourne BC to form user journeys and Wireframes (page types) for the website redevelopment project. These are defined and described in the section 3 below.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Seattle’s Alaskan Way tunnel on track
    March 8, 2013
    Plans are on track for construction work on Seattle’s Alaskan Way tunnel to commence in mid-2013. The massive TBM that will drive the tunnel has been tested in Japan by its manufacturer Hitachi and is now being shipped to the US. The TBM has a 17.5m diameter cutting head, making it the largest machine ever constructed. This is bigger even than the Herrenknecht machine with its 15.62m diameter cutting head built for the Bologna-Florence highway tunnel project in Italy. The new Hitachi TBM has been disassembl
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Generate real-world ROI with reality modeling!
    September 8, 2022
    Understanding existing site conditions is essential to efficiently design, build, and operate road networks around the world. But how can the real-world be captured quickly and cost-effectively?