Skip to main content

Demolition project for UK car park

In the UK town of Luton, a contractor has been hard at work demolishing a car park. Situated in the centre of this large town, the car park had to be removed as it had reached the end of its working life. But the tight space of the urban working environment meant that the contractor had to be extremely careful not to damage surrounding buildings or inconvenience business, traffic or commuters. Long reach excavators with demolition attachments were used by the firm.
November 5, 2012 Read time: 1 min
In the UK town of Luton, a contractor has been hard at work demolishing a car park. Situated in the centre of this large town, the car park had to be removed as it had reached the end of its working life. But the tight space of the urban working environment meant that the contractor had to be extremely careful not to damage surrounding buildings or inconvenience business, traffic or commuters. Long reach excavators with demolition attachments were used by the firm.

View a video clip on the project, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal <span class="oLinkExternal">Click Here</span> Demoltion News false http://www.demolitionnews.com/2012/10/29/video-luton-car-park-coming-down/ false false%>.

Related Content

  • Putzmeister’s new self-propelled pump can be quicker than a truck mount
    January 6, 2017
    Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.
  • Putzmeister’s new self-propelled pump can be quicker than a truck mount
    April 19, 2012
    Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.
  • TESMEC Group’s multi-purpose solutions
    April 9, 2013
    The design and production of high powered tracked trenchers for linear excavation and bulk excavation and surface mining is one of many areas of expertise associated with the TESMEC Group. TESMEC also designs and manufactures machines and integrated systems for the stringing and maintenance of power lines; integrated solutions for the efficiency, the management and the monitoring of power grids; machines for the stringing, maintenance and diagnostic of railway power lines; and the design and production of G
  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    January 6, 2017
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.