Skip to main content

Delcan deal done

In the US Delcan is to provide quality management services for a design-build Project for the Ohio Department of Transportation.
February 28, 2012 Read time: 1 min
In the US 2698 Delcan is to provide quality management services for a design-build Project for the Ohio Department of Transportation. The project involves rebuilding the I-670 and I-71 interchange in Columbus. As a member of the Kokosing Construction design-build team, Delcan will review the design and inspect and test all construction work to confirm compliance to contract requirements. Delcan's quality management data system will be integrated with project schedule, budget and risk management tools and will maximise the use of digital data with GPS enabled field data collection tools. Specific functions performed as part of Delcan's scope include engineering design verification, construction inspection, site survey verification, materials sampling and testing, document management for project records, coordination of project closeout and progress monitoring.

The project includes the reconstruction of one of the busiest sections of Ohio's Interstate system within the heart of Columbus. During the estimated project duration of 38 months, more than 20 new bridge structures, several miles of mechanically stabilised earth walls and over 160 lane km of new interstate highway will be constructed.

For more information on companies in this article

Related Content

  • Transtec leads pavement design for Houston’s SH 249 Extension
    February 12, 2020
    Transtec chosen for pavement design on US$520 million Houston project
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main