Skip to main content

Delcan deal done

In the US Delcan is to provide quality management services for a design-build Project for the Ohio Department of Transportation.
February 28, 2012 Read time: 1 min
In the US 2698 Delcan is to provide quality management services for a design-build Project for the Ohio Department of Transportation. The project involves rebuilding the I-670 and I-71 interchange in Columbus. As a member of the Kokosing Construction design-build team, Delcan will review the design and inspect and test all construction work to confirm compliance to contract requirements. Delcan's quality management data system will be integrated with project schedule, budget and risk management tools and will maximise the use of digital data with GPS enabled field data collection tools. Specific functions performed as part of Delcan's scope include engineering design verification, construction inspection, site survey verification, materials sampling and testing, document management for project records, coordination of project closeout and progress monitoring.

The project includes the reconstruction of one of the busiest sections of Ohio's Interstate system within the heart of Columbus. During the estimated project duration of 38 months, more than 20 new bridge structures, several miles of mechanically stabilised earth walls and over 160 lane km of new interstate highway will be constructed.

For more information on companies in this article

Related Content

  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.
  • Parsons is handling a major interchange project in North Carolina
    June 21, 2017
    Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
  • Advances in asphalt paving equipment coming to market
    June 27, 2018
    Some of the key manufacturers are improving asphalt paving technology with key developments to machines as well as the electronics and telematics systems fitted – Mike Woof writes. Several of the major asphalt paver manufacturers have unveiled new machines and systems that can optimise operations. Improved operating features for the BOMAG BF 800 C-2 paver are said to help increase its output and efficiency when working on-site. An important development is the new traffic light system, which helps improve co
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.