Skip to main content

Delayed ring road due for completion

In Romania, modernisation of capital Bucharest’s ring road is now due for completion in 2012. The delay has been caused by a lack of funds. Upgrading of the sections between DN7 and DN1A and DN1A (Mogosoaia)and DN1 (Otopeni) started in 2007 and some 51km have been improved so far. The total length of the ring road will be 71km when it is complete. Tenders still have to be launched for two more sections of the ring road, the 11km DN2/A2 stretch and the 8.6km A1/DN7 section. Financing for these last section
May 15, 2012 Read time: 2 mins
In Romania, modernisation of capital Bucharest’s ring road is now due for completion in 2012. The delay has been caused by a lack of funds.

Upgrading of the sections between DN7 and DN1A and DN1A (Mogosoaia)and DN1 (Otopeni) started in 2007 and some 51km have been improved so far. The total length of the ring road will be 71km when it is complete.

Tenders still have to be launched for two more sections of the ring road, the 11km DN2/A2 stretch and the 8.6km A1/DN7 section. Financing for these last sections will be provided in part by a €50 million loan from the 1054 European Investment Bank, which is expected to cover around 50% of the costs.

Meanwhile the 1207 SEARCH Corporation is now working on a feasibility study for the construction of Targu Mures-Ditrau highway. Search was contracted by the National Highways and Roads Company.

For more information on companies in this article

Related Content

  • Investment for Brazil’s Sao Paulo ring road
    June 8, 2012
    A new loan has been approved that will help finance works on the northern stretch of the Sao Paulo ring road in Brazil. The US$1.15 billion loan is being provided by the Inter-American Development Bank (IADB). Approval for the IADB loan has come from Brazil’s Committee for Economic Affairs (CAE) at Brazil's Senate. The loan will finance construction of the Rodoanel Norte stretch of the ring road. This measures some 44km long and will connect with the west and east sections of the ring road as well as linkin
  • Romania speeds up motorway work, including A1 TENT route
    August 2, 2018
    Romania’s transport ministry has cut red tape to speed up 13 road projects this year. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year. The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before
  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • Highway traffic management and tunnel safety
    May 14, 2012
    Austria’s new A5 autobahn is now officially open to traffic and the highway is also the first in the country being built under the PPP model. The first 16km stretch of the highway was opened in November 2009 on schedule with the second 35km section now having been opened as well. The contract was carried out by concession company Bonaventura Strassenerhaltungs, a partnership headed by German company Hochtief and Austrian firm Alpine Bau each with 44.4% stakes while French firm Egis Preojects holds the remai