Skip to main content

Deal struck for Poland's A2 highway

Work on two sections of Poland's A2 highway originally planned to be built by the Chinese COVEC will now be constructed by two consortia.
February 27, 2012 Read time: 2 mins
Work on two sections of Poland's A2 highway originally planned to be built by the Chinese COVEC will now be constructed by two consortia. The Eurovia-Warbud consortium will build the 29km A section, which will cost €246.63 million. The 20km C section will be built by the Boegl & Krysl-DSS consortium and will cost €188.54 million. The contracts were awarded by the Polish General Directorate for National Roads and Motorways (1361 GDDKiA). The controversy over the A2 highway project continues however and 2487 COVEC is still fighting a legal battle with 1361 GDDKiA after having its contract cancelled. Meanwhile sub-contractors that were working for 2487 COVEC are still pressing for final payment for work that they carried out. At the same time, Poland's Ministry of Infrastructure is in talks with the 1166 European Bank for Reconstruction and Development (EBRD) and the 1054 European Investment Bank (EIB) as well as other financial institutions. The aim of the talks is to find solutions to highway financing issues, without increasing public debt. Before the end of 2011, two major highway tenders will be announced in Poland. One of these will be for work to the A2 highway between capital Warsaw and Poland's eastern border. The other will be for a 140km section of the A1 highway between Tuszyn and Pyrzowice. Experts say that the A1 project could be carried out under a public-private partnership (PPP) because the highway will carry heavy traffic volumes. A number of private partners have put themselves forward for this PPP proposal including Skanska and Meridiam.

Related Content

  • Financial setbacks beset Slovakia’s highway development
    June 12, 2012
    Slovakian highway company NDS says that construction of the 13km Turany-Hubova highway may not be started in 2012. The previous Transport Ministry plan was to call the tender for this stretch in summer 2012. However, the EC has not yet approved the construction of this highway, with questions surrounding the protected area in the Velka and Mala Fatra mountains. If Slovakia does not get this approval, the country might have to chose the second option, which includes the tunnel Korbelka. The EC's decision is
  • Poland's complex road dispute
    March 1, 2012
    The complex legal case between the Polish General Directorate for National Roads and Motorways (GDDKiA) and Austrian contractor Alpine Bau is continuing in the Polish courts.
  • Reducing highway construction costs
    May 15, 2012
    Cost reductions sought The transport authorities in Montenegro are still considering ways to reduce the construction costs of the Bar-Boljare highway. Croatian company Konstruktor is still keen to work on the highway project, which it priced at €2.7 billion. The Montenegro government cancelled Konstruktor’s concession agreement for the project recently. The Israeli-Greek consortium comprising Aktor, Shikun and Binui-HCH was the second ranked bidder for the project and is in talks with the Montenegro gove
  • Loan for Bosnia project
    June 25, 2012
    The European Bank for Reconstruction and Development (EBRD) has granted a €150million sovereign-guaranteed loan for the construction of part of the new Banja Luka–Doboj motorway in Bosnia and Herzegovina. The loan-targeted motorway section is the main east–est link in Republika Srpska, one of the country’s entities. The EBRD said that it will also support the preparation of the first public–private partnership (PPP) project for the main north–south link in Bosnia and Herzegovina, the Doboj to Vukosavlje seg