Skip to main content

Deal struck for Poland's A2 highway

Work on two sections of Poland's A2 highway originally planned to be built by the Chinese COVEC will now be constructed by two consortia.
February 27, 2012 Read time: 2 mins
Work on two sections of Poland's A2 highway originally planned to be built by the Chinese COVEC will now be constructed by two consortia. The Eurovia-Warbud consortium will build the 29km A section, which will cost €246.63 million. The 20km C section will be built by the Boegl & Krysl-DSS consortium and will cost €188.54 million. The contracts were awarded by the Polish General Directorate for National Roads and Motorways (1361 GDDKiA). The controversy over the A2 highway project continues however and 2487 COVEC is still fighting a legal battle with 1361 GDDKiA after having its contract cancelled. Meanwhile sub-contractors that were working for 2487 COVEC are still pressing for final payment for work that they carried out. At the same time, Poland's Ministry of Infrastructure is in talks with the 1166 European Bank for Reconstruction and Development (EBRD) and the 1054 European Investment Bank (EIB) as well as other financial institutions. The aim of the talks is to find solutions to highway financing issues, without increasing public debt. Before the end of 2011, two major highway tenders will be announced in Poland. One of these will be for work to the A2 highway between capital Warsaw and Poland's eastern border. The other will be for a 140km section of the A1 highway between Tuszyn and Pyrzowice. Experts say that the A1 project could be carried out under a public-private partnership (PPP) because the highway will carry heavy traffic volumes. A number of private partners have put themselves forward for this PPP proposal including Skanska and Meridiam.

Related Content

  • Material transfer vehicles for Poland
    April 1, 2014
    Roadtec Shuttle buggies are now being used on major road projects in Poland. This follows a decision made by the Polish road authority, GDDKIA, to use material transfer vehicles on highway projects. The need for a smooth running surface is paramount on highways as in Poland these tolled links can allow speed limits of up to 140km/h. This is why GDDKIA decided the use of a material transfer vehicle was crucial to optimising mix delivery into pavers, so as to help optimise surface finish.
  • EBRD funding for St Petersburg project?
    April 27, 2012
    The European Bank for Reconstruction and Development (EBRD) intends to provide a US$277 million (€200 million) loan to the Northern Capital Highway consortium, which will build the central 11.5km section of St Petersburg’s Western High Speed Diameter (WHSD) route. The EBRD’s board of directors has said will consider the loan on 14th February 2012. The finance package is of note as Russian road projects have largely found funds from other sources so far. The Northern Capital Highway consortium estimates the
  • New tender for section of A4 highway in Poland
    August 24, 2012
    A new tender has been offered for the construction of the Debica-Tarnow section of the A4 motorway in southern Poland. The Polish General Directorate for National Roads and Motorways (GDDKiA) decided to call a new tender after deciding not to continue working with the consortium of Hydrobudowa, SIAC Construction, PBG, and Aprivia.
  • Important road works for Slovakia
    July 6, 2023
    Important road connection works are underway for Slovakia.