Skip to main content

Deal struck for Poland's A2 highway

Work on two sections of Poland's A2 highway originally planned to be built by the Chinese COVEC will now be constructed by two consortia.
February 27, 2012 Read time: 2 mins
Work on two sections of Poland's A2 highway originally planned to be built by the Chinese COVEC will now be constructed by two consortia. The Eurovia-Warbud consortium will build the 29km A section, which will cost €246.63 million. The 20km C section will be built by the Boegl & Krysl-DSS consortium and will cost €188.54 million. The contracts were awarded by the Polish General Directorate for National Roads and Motorways (1361 GDDKiA). The controversy over the A2 highway project continues however and 2487 COVEC is still fighting a legal battle with 1361 GDDKiA after having its contract cancelled. Meanwhile sub-contractors that were working for 2487 COVEC are still pressing for final payment for work that they carried out. At the same time, Poland's Ministry of Infrastructure is in talks with the 1166 European Bank for Reconstruction and Development (EBRD) and the 1054 European Investment Bank (EIB) as well as other financial institutions. The aim of the talks is to find solutions to highway financing issues, without increasing public debt. Before the end of 2011, two major highway tenders will be announced in Poland. One of these will be for work to the A2 highway between capital Warsaw and Poland's eastern border. The other will be for a 140km section of the A1 highway between Tuszyn and Pyrzowice. Experts say that the A1 project could be carried out under a public-private partnership (PPP) because the highway will carry heavy traffic volumes. A number of private partners have put themselves forward for this PPP proposal including Skanska and Meridiam.

Related Content

  • FIEC aims to tackle lowest possible cost bidding
    February 28, 2012
    The FIEC, the European construction industry federation, aims to end unfair competition by state-owned and state-aided enterprises across the globe.
  • Ring road for Sarajevo nears completion
    December 17, 2012
    The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of HP Investing and Strabag. The completed Ring Road will be part of the future Corridor Vc motorway. Bosnia and Herzegovina Federal Minister of Transport and Telecoms, Enver Bijedic, and State Minister of Telecoms and Transport and Director of the roads company JP Ceste FBiH, Filip Vujevo, r
  • A key section of highway is now open in Romania
    July 26, 2012
    In Romania the northern section of the bypass around the city of Constanta is open to traffic. The bypass forms part of the Pan-European Road Corridor IV and work on this section was financed by the European Bank for reconstruction and Development (EBRD). The southern stretch of the 23km bypass was completed in 2011. Now it is complete, the bypass will carry heavy port traffic away from Constanta. It will also provide a free-flowing route for tourist traffic from Romanian capital Bucharest and the north of
  • Impressa Pizzarotti signs Polish S61 dual carriageway deal
    June 12, 2017
    Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.