Skip to main content

Date set to complete D1 Višňové Tunnel section

The D1 section between Lietavská Lúčka and Dubná Skala in Slovakia includes the partially completed 7.5km twin-tube Višňové Tunnel - to be the country's longest.
By David Arminas July 20, 2023 Read time: 2 mins
The Višňové Tunnel – seen here before further work was started after changing contractors – is part of Slovakia’s longest motorway (image © Peter Lovás/Dreamstime)

Construction of the D1 between Lietavska Lucka and Dubna Skala in northern Slovakia, which includes the Višňové Tunnel, is to be completed within two years.

According to Slovakia’s national road company, NDS, the cost of the project has risen by around €23 million to just under €278 million since the original work was awarded in 2015.

The package of works is for the 13.5km D1 highway between Lietavská Lúčka and Dubná Skala and includes construction of the partially completed 7.5km twin-tube Višňové Tunnel – to be the longest road tunnel in Slovakia. The section will help reduce journey times in the area around Žilina.

A consortium led by Skanska’s Slovakian business is the main contractor for the project after being awarded the work in early 2021. Skanska took over the project from the original contractor, the Italian-Slovak consortium of Salini Impregilo – now Webuild - and Dúha. Completion, originally set for the end of this year, has been delayed due to deterioration of the tunnel due to the hiatus of work when switching contractors. Drainage issues were a major problem, according to media reports.

The D1 is an east-west motorway that connects Bratislava through to Michalovce and the border with the Ukraine. It is the main motorway in Slovakia as well as being the country’s longest and busiest motorway, forming part of several pan-European roures, including the E50, E58 and E75. With the exception of sections in Bratislava, a vignette is required to use the motorway.

Last year, NDS has tendered for tunnel and vehicle IT equipment for the Visnove Tunnel, with an expected cost of around €71.5 million. The contract also includes IT equipment for the D1 motorway stretch Lietavska Lucka and Dubna Skala.

Meanwhile, seven regions in Slovakia have been given the green light to apply for government funding aimed at the modernisation, reconstruction and construction of Class II and III roads, including bridges. Around €21 million has been earmarked for road reconstruction, while €10 million will be allocated for bridge reconstruction. The Bratislava region is not included in the call.

Up to €170 million is now being allocated for the upgrade of Class II and III roads, with around €165 million allocated to the development of transport links in less developed regions.

For more information on companies in this article

Related Content

  • Skanska awarded Slovakian highway contract
    May 5, 2021
    Skanska has been awarded a major Slovakian highway contract.
  • Duha and Salini Impregilo to build Slovakia D1 motorway stretch
    April 23, 2014
    Slovak national motorway company NDS has chosen the consortium consisting of fellow Slovak construction company Duha and Salini Impregilo of Italy as the winner of the public procurement tender to build a 13km stretch of the D1 motorway. The Lietavska Lucka-Visnove-Dubna Skala stretch of Slovakia’s D1 includes the 7.5km long Visnove tunnel and is a tender worth nearly €410 million. It is expected that Skanska and Doprastav, which were excluded from the competition, will appeal against NDS' tender award dec
  • Cost of D1 section Hubova-Ivachnova rises 40%
    August 3, 2023
    In Slovakia, the 15km Ružomberok bypass, including the 3.6km Čebrať Tunnel, is now €93 million more expensive than nine years ago.
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th