Skip to main content

Danube Bridge 2 official opening

The new Vidin–Calafat Bridge – also known Danube Bridge 2 – was being officially opened today. A road and rail bridge between the cities of Calafat, Romania and Vidin, Bulgaria, Danube Bridge 2 is the second bridge on the shared section of the Danube between Romania and Bulgaria. Expected to today’s event were dignitaries including the president of the Republic of Bulgaria Rosen Plevneliev, Romania Prime Minister Victor Ponta, and European Commissioner for Regional Policy Johannes Hahn.
June 13, 2013 Read time: 1 min
The new Vidin–Calafat Bridge – also known Danube Bridge 2 – was being officially opened today.

A road and rail bridge between the cities of Calafat, Romania and Vidin, Bulgaria, Danube Bridge 2 is the second bridge on the shared section of the Danube between Romania and Bulgaria.

Expected to today’s event were dignitaries including the president of the Republic of Bulgaria Rosen Plevneliev, Romania Prime Minister Victor Ponta, and European Commissioner for Regional Policy Johannes Hahn.

The Dunav Most 2 Vidin-Calafat joint venture for the operation of Danube Bridge 2 has been set up by the transport ministries of Bulgaria and Romania.

Related Content

  • Tender evaluation nears for Croatia’s Peljeski Bridge Project
    September 22, 2017
    Croatia’s roads agency Hrvatske Ceste will soon start evaluating tenders for the controversial Peljeski Bridge project, according to national media. Bids for construction of the four-lane 2.4km long bridge have been submitted by the China Road and Bridge Corporation, Austria's Strabag as well as consortia headed by Italy’s Astaldi and the Turkish company Ictas. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay.
  • Austria's first PPP project takes shape
    July 31, 2012
    North of the Austrian capital Vienna, one of the region's biggest transport infrastructure projects for decades is currently under construction, the A5 Nordautobahn. This will give the Greater Vienna region its first-ever high-capacity link to the Czech motorway and arterial road network, greatly easing congestion on the old main road. In the first phase of construction, 22.7km of motorway are to be built. Work on the second section, all the way through to the Czech border, is to start in 2010. The A5 Norda
  • Six years for Belgrade-Novi Sad highway
    September 17, 2024
    Total cost of the 100-km project in Serbia is estimated at €1.6 billion and will be completed by the Chinese company Shandong Hi-Speed Group.
  • US$1.7 billion Francis Scott Key Bridge replacement design
    February 6, 2025
    The design of the US$1.7 billion Francis Scott Key Bridge replacement is revealed.