Skip to main content

Danube Bridge 2 official opening

The new Vidin–Calafat Bridge – also known Danube Bridge 2 – was being officially opened today. A road and rail bridge between the cities of Calafat, Romania and Vidin, Bulgaria, Danube Bridge 2 is the second bridge on the shared section of the Danube between Romania and Bulgaria. Expected to today’s event were dignitaries including the president of the Republic of Bulgaria Rosen Plevneliev, Romania Prime Minister Victor Ponta, and European Commissioner for Regional Policy Johannes Hahn.
June 13, 2013 Read time: 1 min
The new Vidin–Calafat Bridge – also known Danube Bridge 2 – was being officially opened today.

A road and rail bridge between the cities of Calafat, Romania and Vidin, Bulgaria, Danube Bridge 2 is the second bridge on the shared section of the Danube between Romania and Bulgaria.

Expected to today’s event were dignitaries including the president of the Republic of Bulgaria Rosen Plevneliev, Romania Prime Minister Victor Ponta, and European Commissioner for Regional Policy Johannes Hahn.

The Dunav Most 2 Vidin-Calafat joint venture for the operation of Danube Bridge 2 has been set up by the transport ministries of Bulgaria and Romania.

Related Content

  • Bucharest win for Aktor-Eurocontsruct
    October 27, 2021
    Lot 3 of the Bucharest south ring road is worth around €173.76 million.
  • TRA event planned for 2016 in Warsaw
    September 16, 2015
    The Transport Research Arena 2016 event is being held in the Polish capital Warsaw April 18th to 21st. The TRA2016 conference is the most important transport research event in Europe and is held every two years. The conference is aimed at stakeholders including researchers, experts, operators, industry and policy-makers. The event is being backed by the European Commission, in cooperation with the Conference of European Directors of Roads (CEDR) and the European Technological Platforms. The Ministry of Infr
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev
  • Cranes coming down on Gordie Howe Bridge
    June 30, 2025
    The Gordie Howe International Bridge will route traffic away from more populated areas and directly connect Highway 401 in the Canadian province of Ontario with the Interstate 75 in the US state of Michigan.