Skip to main content

Danube Bridge 2 official opening

The new Vidin–Calafat Bridge – also known Danube Bridge 2 – was being officially opened today. A road and rail bridge between the cities of Calafat, Romania and Vidin, Bulgaria, Danube Bridge 2 is the second bridge on the shared section of the Danube between Romania and Bulgaria. Expected to today’s event were dignitaries including the president of the Republic of Bulgaria Rosen Plevneliev, Romania Prime Minister Victor Ponta, and European Commissioner for Regional Policy Johannes Hahn.
June 13, 2013 Read time: 1 min
The new Vidin–Calafat Bridge – also known Danube Bridge 2 – was being officially opened today.

A road and rail bridge between the cities of Calafat, Romania and Vidin, Bulgaria, Danube Bridge 2 is the second bridge on the shared section of the Danube between Romania and Bulgaria.

Expected to today’s event were dignitaries including the president of the Republic of Bulgaria Rosen Plevneliev, Romania Prime Minister Victor Ponta, and European Commissioner for Regional Policy Johannes Hahn.

The Dunav Most 2 Vidin-Calafat joint venture for the operation of Danube Bridge 2 has been set up by the transport ministries of Bulgaria and Romania.

Related Content

  • The Nepalese Government is investing in roads around capital Kathmandu
    May 16, 2012
    A new road-widening strategy is being put into effect in Nepal’s Kathmandu Valley. The aim of this programme is to reduce traffic jams on busy roads, especially during peak hours. A major problem for Kathmandu is that the current road the infrastructure in the city is not sufficient for the increasing numbers of vehicles. In a bid to tackle the problem, the authorities have initiated a programme of road widening in various areas of Kathmandu Valley. However, obstructions have been encountered due to residen
  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.
  • Romania’s Bacău Orbital now complete
    July 19, 2021
    The almost US$161.3 million orbital - of which half is motorway - includes seven bridges, a junction and nine passages.
  • Sales down but Deutz keeps profit level in first half 2015
    August 11, 2015
    German engine maker Deutz has reported new order sales were down just over 10% in the first half of this year, to €670.7 million. Unit sales also fell, around 21% down on the first half of last year, to 78,120 engines. Sales of 41,213 engines in the second quarter of 2015 were 11.7% higher than in the previous quarter but were 24.5% lower than in prior-year quarter (Q2 2014: 54,622 engines). Revenue was in line with forecasts, falling by 11% year on year to €670.2 million compared with €753.4 million