Skip to main content

Danish road widening and major bridge construction

Engineering Company Atkins is now handling design work on a major highway and bridge project in Denmark.
February 22, 2012 Read time: 2 mins
Engineering Company 3005 Atkins is now handling design work on a major highway and bridge project in Denmark.

It is carrying out preliminary studies and design work for several new and existing bridges as part of a programme on the Køge Bay Highway that involves widening the highway from six to eight lanes, and requires the construction of seven new bridges, extension of nine existing bridges and reinsulation of three bridges. The 8km long section of highway, which carries over 100,000 vehicles/day, will remain operational while the work is taking place. Traffic will run alongside the extended lanes.

Atkins will work closely with the Danish Road Directorate and other
consultants working on the consultants working on the extension to ensure that extension to ensure that disruption to traffic is kept to a minimum. The first phase of the project will see the the project will see the construction of a new bridge across Karlstrup Marsh, located next to the existing highway.

Martin Svenning Nielsen and his team of bridge experts from the former Gimsing & Madsen consultancy, acquired by Atkins last year, have consulted on a number of highway structures in Jutland, highway structures in Jutland, Denmark. The team also served as client advisors for the construction of Denmark’s longest, tallest valley bridge over Funder Valley Silkeborg.

For more information on companies in this article

Related Content

  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • India plans major infrastucture investment
    February 10, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports. On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt.
  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo