Skip to main content

Danish PPP landmark move

Denmark is making a landmark move in the highway building sector by setting up its first public-private partnership (PPP) contract. The deal is for the construction and operation of a 26km highway linking Sønderborg and Kliplev and is worth €148 million. The 26-year contract includes building the M51 and building seven junctions and 18km of secondary roads. The Kliplev Motorway Group (KMG) consortium will build the link and is led by Vienna, Austria-based Strabag, which will participate in the project throu
July 5, 2012 Read time: 1 min
Denmark is making a landmark move in the highway building sector by setting up its first public-private partnership (PPP) contract.

The deal is for the construction and operation of a 26km highway linking
Sønderborg and Kliplev and is worth €148 million. The 26-year contract includes building the M51 and building seven junctions and 18km of secondary roads.

The 2352 Kliplev Motorway Group (KMG) consortium will build the link and is led by Vienna, Austria-based 945 Strabag, which will participate in the project through its German subsidiary Becker Bau Neustadt.

For more information on companies in this article

Related Content

  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31
  • Czech highway deal for consortium partners
    February 5, 2019
    A consortium has won a package of works to construct a section of the D35 highway in the Czech Republic. The 12.6km stretch of the D35 highway lies between Opatovice and Časy and the project has a contract value of €132 million, with the work expected to take 44 months to complete. The consortium is headed by Austrian contractor STRABAG with a 41% stake in the deal and also includes the Czech firms Silnice and SMP CZ. This new four-lane link will feature two interchanges. The D35 is part of the northern
  • Strabag toast ‘double-digit’ revenue and earnings rise
    April 27, 2012
    Strong demand in the German building construction and civil engineering sector and booming Polish transport infrastructure construction helped fuel a double-digit increase in Strabag revenue and earnings during the 2011 financial year. The Austrian construction firm’s earnings before tax and interest (EBIT) rose by 12% to US$442.81million (€334.78million), resulting in an unchanged EBIT margin of 2.4%. Meanwhile, Strabag’s revenue rose by 11% to $18.13billion (€13.71billion).
  • Immersed tube Fehmarnbelt Tunnel approved
    February 21, 2012
    The Danish government has given its approval for the construction of the 18km immersed tube Fehmarnbelt Tunnel, which will connect the country with Germany.