Skip to main content

D3 Tabor-Veseli motorway section in Czech Republic opens

The newly built US$522.81 million (CZK 10.45bn) D3 motorway section between Tabor and Veseli nad Luznici in the Czech Republic has officially opened. The partially EU funded 25km route was built by a consortium of four companies Eurovia CS, Strabag, Metrostav and Inzinierske Stavby. The motorway section includes 48 bridges, 277 construction objects and ten sound barriers.
July 3, 2013 Read time: 1 min
The newly built US$522.81 million (CZK 10.45bn) D3 motorway section between Tabor and Veseli nad Luznici in the Czech Republic has officially opened.

The partially EU funded 25km route was built by a consortium of four companies 3281 Eurovia CS, 945 Strabag, Metrostav and 6009 Inzinierske Stavby. The motorway section includes 48 bridges, 277 construction objects and ten sound barriers.

For more information on companies in this article

Related Content

  • Czech roads get quality assurance
    June 25, 2012
    In the Czech Republic the road authorities are looking to address quality issues that have caused problems on the country’s roads and highways. The Czech Roads and Motorways Directorate (RSD) plans to check the quality of highways using vehicle-mounted scanning laser technology. This will allow RSD to launch repairs before potholes are formed.
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Strabag wins Polish A1 motorway deal for Wozniki-to-Pyrzowice section
    September 2, 2015
    Strabag consortium has signed a contract for construction of a 15.2km section of the A1 motorway between Wozniki and Pyrzowice. Completion of the section that will connect Pyrzowice with Czestochowa is due by the end of 2018. It is the first of four contracts signed for construction of the motorway. Strabag’s offer is believed to be around €144 million, while the budget set by the General Directorate for National Roads and Motorways (GDDKiA), was set just over €200 million. Meanwhile, the S6 dual car