Skip to main content

Czech tender interest from international companies

The tender process for upgrade works on the D1 highway in the Czech Republic is attracting international bidding. The five sections of highway are worth €173.2 million in all, with investments of €59 million planned for 2012. Companies entering bids so far include Metrostav, Skanska, Strabag, Eurovia CS, Swietelsky Stavebni, OHL ZS, Dalnicni Stavby Praha. Bidders also include several consortia including one comprising M-Silnice, Bogl a Krysl and Berger Bohemia and one made up of Hochtief CZ and Silnice Casl
December 13, 2012 Read time: 2 mins
The tender process for upgrade works on the D1 highway in the Czech Republic is attracting international bidding.

The five sections of highway are worth €173.2 million in all, with investments of €59 million planned for 2012. Companies entering bids so far include Metrostav, 2296 Skanska, 945 Strabag, 3281 Eurovia CS, 7019 Swietelsky Stavebni, 980 OHL ZS, Dalnicni Stavby Praha. Bidders also include several consortia including one comprising M-Silnice, Bogl a Krysl and Berger Bohemia and one made up of 981 Hochtief CZ and Silnice Caslav. Also in the Czech Republic, 11 firms are bidding for the construction of two new stretches of the D3 highway stretches with a combined value of €105.76 million. Bidders include Metrostav, Skanska, Strabag, Eurovia CS, Swietelsky Stavebni. They also include a consortium comprising Berger Bohemia, SMP CZ, VHS and Bogl a Krysl and another consortium made up of Held&Francke CZ and Firesta-Fiser. Consortia headed by 184 Colas, 1332 Alpine Bau, Imos Brno and Hochtief are also bidding. Construction work is expected to commence in autumn 2012.

For more information on companies in this article

Related Content

  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • Prequalification tender for Oman carriageway project floated
    June 13, 2013
    The Tender Board of Oman has floated, on behalf of the Ministry of Transport and Communications, a prequalification tender for building Section 2 of the Daba-Lima-Khasab carriageway in the country's Musandam Governorate. Section 2 of the Design-Build-Operate (DBO) project involves a 65km stretch between Daba and Alkhalidya. The project will involve 18 valley and wadi bridges covering 3.79km in combined distance, and up to seven tunnels with a joint length of 7.32km. Of the tunnels, the biggest has a length
  • A6 project between Weinsberg and Wiesloch/Rauenberg set to start
    January 26, 2017
    Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways. Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded. On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge. Preparatory work for the public-private partnership has
  • Poland tenders for Czestochowa A1 motorway section
    June 18, 2019
    Poland’s General Directorate for National Roads and Motorways (GDDKiA) reports that that the three bids for the Czestochowa A1 motorway section exceed the agency’s budget. The least expensive bid was nearly €101 million, submitted by a consortium of Strabag Infrastruktura Poludnie, Budimex and Budpol. Lemar bid around €121 million while Intercor bid €159 million. GDDKiA said that the bids will not automatically be rejected. Earlier this year GDDKiA terminated its contract with Salini Polska, signed