Skip to main content

Czech roads get quality assurance

In the Czech Republic the road authorities are looking to address quality issues that have caused problems on the country’s roads and highways. The Czech Roads and Motorways Directorate (RSD) plans to check the quality of highways using vehicle-mounted scanning laser technology. This will allow RSD to launch repairs before potholes are formed.
June 25, 2012 Read time: 2 mins
In the Czech Republic the road authorities are looking to address quality issues that have caused problems on the country’s roads and highways.

The 4785 Czech Roads and Motorways Directorate (RSD) plans to check the quality of highways using vehicle-mounted scanning laser technology. This will allow RSD to launch repairs before potholes are formed.

It is estimated that costs of the repairs will be cut by 30%. RSD tried a similar method of scanning in 2006 but the project was suspended because of a lack of funding.

Meanwhile in the Czech Republic tenders worth €146.15 million are now open for bids. The bidding process was started for the 50 tenders by the RSD. Most of the tenders relate to the D1 and D3 highway project, the Prague ring road, the R6 link between Prague and Karlovy Vary and for documentation and technical supervision of the upgrade works. RSD will also spend €32.4million on the technical supervision of smaller projects in the next four years.

And construction is underway for the last section of the D8 highway through the Ceske Stredohori mountain range. The geological survey on the 12.7km road has been under way since 23 April 2012. The D8 project is expected to be completed by early 2015.

For more information on companies in this article

Related Content

  • Czech road plans call for major construction
    January 31, 2018
    The Czech Republic is setting out its programme to develop its road infrastructure network. The plans call for work to build 360km of roads and highways as well as maintaining existing stretches. The construction plans include work on the Prerov section of the D1 highway, a stretch of the D40 from Hulin to Frystak, the Hodejovice section of the D3 highway and the Frydek-Mistek by-pass. They also include work to two sections each of the D35 highway and D11 highway as well as a number of bypasses for the D6
  • Delays on Slovakian projects
    July 9, 2012
    Work on several new highways being built in Slovakia as public-private partnerships (PPPs) will be delayed by six to 12 months. This means that the first sections of the Martin-Presov link will not open before 2011. The last section is expected to be completed in either late 2012 or early 2013.
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Poland's big transport plans
    July 6, 2012
    The European Investment Bank (EIB) looks likely to grant Poland a loan of €1.6 billion to carry out several key infrastructure projects. Some of the money will be used to finance the A2 highway from Lodz to Warsaw; Warsaw's southern ring road and a 50km section of the A4 highway to link with Germany.