Skip to main content

Czech highway tenders open

In the Czech Republic tenders worth €146.15 million are now open for bids. The bidding process was started for the 50 tenders by the Czech Roads and Motorways Directorate (RSD). Most of the tenders relate to the D1 and D3 highway project, the Prague Ring Road and the R6 link between Prague and Karlovy Vary and for documentation and technical supervision of the upgrade works. RSD will also spend €32.4 million on the technical supervision of smaller projects in the next four years.
April 10, 2012 Read time: 1 min

In the Czech Republic tenders worth €146.15 million are now open for bids. The bidding process was started for the 50 tenders by the 4785 Czech Roads and Motorways Directorate (RSD). Most of the tenders relate to the D1 and D3 highway project, the Prague Ring Road and the R6 link between Prague and Karlovy Vary and for documentation and technical supervision of the upgrade works. RSD will also spend €32.4 million on the technical supervision of smaller projects in the next four years.

For more information on companies in this article

Related Content

  • Costa Rica highway concession package cancelled
    March 19, 2014
    The Costa Rican Government is paying compensation worth US$28.4 million for the cancellation of a highway concession package. The compensation relates to the San José-San Ramón highway concession and is being paid to the Brazilian construction company OAS, reports Business News Americas. This follows a legal dispute over the project and is some $10 million less than OAS originally claimed in compensation. The 30 year concession package was cancelled last year due to opposition. There were allegations of a c
  • Doosan launches new excavator
    January 6, 2017
    The new Doosan DX225LCA excavator being launched at Intermat has an operating weight of between 21.5 and 23.2tonnes, depending on the configuration. Its bucket capacity ranges from 0.39 to 1.28m3. It also has a digging depth of 6,620 mm, a reach of 9,900mm and a digging height of 9,750 mm.
  • Doosan launches new excavator
    February 21, 2012
    The new Doosan DX225LCA excavator being launched at Intermat has an operating weight of between 21.5 and 23.2tonnes, depending on the configuration. Its bucket capacity ranges from 0.39 to 1.28m3. It also has a digging depth of 6,620 mm, a reach of 9,900mm and a digging height of 9,750 mm.
  • St Petersburg ring road row
    May 30, 2012
    A LEGAL dispute is now underway in Russia over the St Petersburg ring road project. Construction company Flora was awarded a €187.6 million contract for an 11km section of the ring road in 2008, winning the tender by making the lowest bid. However, the Russian authorities have taken the contract for this section of the ring road away from Flora claiming it did not meet set targets. Flora is disputing the loss of the contract with the authorities.