Skip to main content

Czech highway connection finally gets go-ahead

A long running land dispute in the Czech Republic has finally been settled, which will allow a key road link to be built after years of delay.
February 28, 2012 Read time: 2 mins
A long running land dispute in the Czech Republic has finally been settled, which will allow a key road link to be built after years of delay. Work on the 2.5km section of the D11 highway is now commencing in 2012 and the construction work will cost €61.6 million. Building this link will take around 18 months and the road is expected to be open to traffic by 2014.

The Czech Transport Ministry Roads and Motorways Directorate (RSD) had been trying to buy the rights to the land to allow the construction for 17 years but had been continually blocked by the owner. However, a hiccup with regard to funds at RSD may hold up the project further. The RSD does not have immediate access to the €3.72 million necessary to purchase the land.

The Czech Transport Ministry has insisted that the money is in the RSD account which is used for the land purchases. The transaction may be further complicated also by the Land Fund, which has to give approval for the deal. Meanwhile the Transport Ministry hopes to boost the budget for the State Transport Infrastructure Fund (SFDI) by at least €410.6 million.

The transport Ministry says that the current funding is barely sufficient for completing the ongoing road construction projects. If further financing is not granted, the Czech Republic will not be able to use all available funds from the EU Operational Programme Transport.

Related Content

  • Futureproofing UK construction equipment resilience
    May 5, 2021
    Rob Oliver is the longstanding CEO of the Construction Equipment Association (CEA), the UK trade association for the UK construction equipment industry. Guy Woodford recently caught up with him to discuss the industry’s health and the key issues facing the CEA and its members in 2021 and beyond.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea
  • Central Ring Road to become one of most important projects in modern history of road-building in Russia
    December 16, 2014
    Moscow’s new ring road will provide a major economic boost and tackle congestion - Eugene Gerdner writes The Russian Government has officially started building of the Central Ring Road (CRR), one of the largest infrastructural projects in the modern history of the country. Total volume of investments in the project is estimated at more than US$7.2 billion (300 billion RUB). Building of the road should be completed by the World Cup 2018 and will be carried out as part of the existing state program ‘The de