Skip to main content

Crucial Russian road

Preparation work is due to start on the new six-lane highway between St Petersburg and Tosno.
March 1, 2012 Read time: 1 min
Preparation work is due to start on the new six-lane highway between St Petersburg and Tosno. This will form part of the new Moscow - St Petersburg toll road. The tender process for the 38km section of this toll road concession will open in 2012. The project is expected to cost US$1.15 billion and is planned to open to traffic in 2015. There are issues over the project however and several groups have raised environmental concerns as the intended route takes the highway through forest areas and agricultural land. The designers say that environmental requirements will be met.

Related Content

  • $250 million for Oregon-Washington bridge replacement
    July 10, 2025
    Oregon and Washington will provide $250 million for the Hood River-White Salmon Bridge replacement.
  • Spanish firms pre-qualify for US$1.15bn worth of Colombian road projects
    August 7, 2013
    Several Spanish firms with operations in Colombia have gained pre-qualification for two tenders to build and maintain two roads in the country requiring an estimated combined investment of US$1.15 billion. OHL Concesiones Chile and OHL Concesiones Colombia (part of the Spanish OHL group), Sacyr Concesiones Colombia (part of Spanish group Sacyr) and Ortiz Construcciones y Proyectos Colombia, and Acciona Concesiones Chile (part of the Spanish group Acciona), are pre-qualified for the Pacific 2 Connection. The
  • New Vietnam North-South highway link planned
    April 12, 2017
    Work on the new North-South Highway in Vietnam is now underway, with preparatory work having commenced in 2016 and construction scheduled for completion in 2020. The project is being carried out under the PPP model, with initial funding being provided by a system of Government Bonds. The project is expected to cost US$2.43 billion to complete. The tender process for the design phase of the project is now opening, while a pre-feasibility study has yet to be carried out. The project is being overseen by Vietn
  • New Russian highway section opening
    September 21, 2018
    The first section of Russia’s new A181 Scandinavia highway is due to open to traffic in October 2018. However, this is 12 months later than was originally planned as the project has been subject to a number of unforeseen issues. The new link will connect St Petersburg with Ogonki and the work has been carried out by contractor VAD, costing US$148.3 million.