Skip to main content

Cross Fraser Partnership wins BC tunnel work

The partnership for the tunnel work near Vancouver in Canada consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and is supported by design and engineering consultant Arcadis.
By David Arminas September 27, 2024 Read time: 2 mins
The new tunnel will be built parallel to and just upstream from the existing 629m-long four-lane Massey Tunnel that was opened in 1959 (conceptual drawing courtesy of BC Government)

Cross Fraser Partnership has been awarded the Design Early Works Agreement (DEWA) for the Fraser River Tunnel Project by the Canadian province of British Columbia.

This agreement signals the start of the development phase, which allows for a transparent and collaborative approach to tunnel design, project schedule, costs and risks associated with the project close to the city of Vancouver.

The new tunnel will be built parallel to and just upstream from the existing 629m-long four-lane Massey Tunnel that was opened in 1959. It was the first project in North America to use immersed tube technology and remains Canada’s only tunnel below sea level and now carries more than its design limit of 80,000 vehicles a day. Extensive renovations to the tunnel and attempts to improve access roads have been done over the years, but the structure has only about 10 years of useful life, according to some reports.

Cross Fraser Partnership is an equal-parts consortium of major Canadian and international construction and engineering firms with a track record in delivering complex infrastructure projects.

The partnership consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and supported by design and engineering consultant Arcadis.

The proposed eight-lane immersed tube tunnel will incorporate advanced engineering solutions and sustainable construction practices, reflecting what the consortium says is its commitment to innovation and environmental stewardship.

The Fraser River Tunnel Project is a key component of the broader Highway 99 Tunnel Programme and the province's broader transportation strategy. The project will improve travel times and reliability, increase connections across the South Arm of the Fraser River near the mouth of the river and support economic growth in the lower mainland region.

The new crossing will be an eight-lane immersed tube tunnel with three general-purpose lanes and a dedicated transit lane in each direction. It will also feature a separate multi-use path to support pedestrians, cyclists and other active transportation options.

The project includes replacing the existing Deas Slough Bridge and the Highway 99 upgrades between Westminster Highway in the city of Richmond and the Ladner Trunk Road in the city of Delta.

An earlier replacement proposal – a 3km-long 10-lane cable-stayed bridge costing US$2.8 billion - was underway in 2015. However, a provincial election in 2017 saw a change of government which promptly scrapped the project in favour of more research and consultation with the mayors of the greater Vancouver area cities and municipalities. In October 2019 the mayors recommended an eight-lane tunnel as the replacement.

Related Content

  • Canadian PM Trudeau warned of costs rises for Gordie Howe Bridge
    January 11, 2016
    A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports. The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings. The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, w
  • Lindsay argues the case for reversible lanes over adding lanes
    June 26, 2018
    Build new lanes or use existing lanes more effectively? In a recent US study* commissioned by Lindsay Transportation Solutions, the company argues the case for reversible lanes. The level of future uncertainty in transportation planning - specifically in addressing congestion on urban freeways - has increased significantly over the past few years. The impact of connected and autonomous vehicles on traffic flow, of Mobility as a Service (MaaS) initiatives, particularly the car-sharing elements, and exciting
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges