Skip to main content

Cross Fraser Partnership wins BC tunnel work

The partnership for the tunnel work near Vancouver in Canada consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and is supported by design and engineering consultant Arcadis.
By David Arminas September 27, 2024 Read time: 2 mins
The new tunnel will be built parallel to and just upstream from the existing 629m-long four-lane Massey Tunnel that was opened in 1959 (conceptual drawing courtesy of BC Government)

Cross Fraser Partnership has been awarded the Design Early Works Agreement (DEWA) for the Fraser River Tunnel Project by the Canadian province of British Columbia.

This agreement signals the start of the development phase, which allows for a transparent and collaborative approach to tunnel design, project schedule, costs and risks associated with the project close to the city of Vancouver.

The new tunnel will be built parallel to and just upstream from the existing 629m-long four-lane Massey Tunnel that was opened in 1959. It was the first project in North America to use immersed tube technology and remains Canada’s only tunnel below sea level and now carries more than its design limit of 80,000 vehicles a day. Extensive renovations to the tunnel and attempts to improve access roads have been done over the years, but the structure has only about 10 years of useful life, according to some reports.

Cross Fraser Partnership is an equal-parts consortium of major Canadian and international construction and engineering firms with a track record in delivering complex infrastructure projects.

The partnership consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and supported by design and engineering consultant Arcadis.

The proposed eight-lane immersed tube tunnel will incorporate advanced engineering solutions and sustainable construction practices, reflecting what the consortium says is its commitment to innovation and environmental stewardship.

The Fraser River Tunnel Project is a key component of the broader Highway 99 Tunnel Programme and the province's broader transportation strategy. The project will improve travel times and reliability, increase connections across the South Arm of the Fraser River near the mouth of the river and support economic growth in the lower mainland region.

The new crossing will be an eight-lane immersed tube tunnel with three general-purpose lanes and a dedicated transit lane in each direction. It will also feature a separate multi-use path to support pedestrians, cyclists and other active transportation options.

The project includes replacing the existing Deas Slough Bridge and the Highway 99 upgrades between Westminster Highway in the city of Richmond and the Ladner Trunk Road in the city of Delta.

An earlier replacement proposal – a 3km-long 10-lane cable-stayed bridge costing US$2.8 billion - was underway in 2015. However, a provincial election in 2017 saw a change of government which promptly scrapped the project in favour of more research and consultation with the mayors of the greater Vancouver area cities and municipalities. In October 2019 the mayors recommended an eight-lane tunnel as the replacement.

Related Content

  • New NY Bridge - Tappan Zee - main span towers poured
    December 16, 2016
    One of the largest US infrastructure projects is nearer completion after recent topping out of the eight main span towers of the New NY Bridge. The final concrete pour was in mid-December and all piles - more than 1,000 - have been installed in Hudson River. To date, 3,000 roadway panels for the approaches - making 5.5km in length - have been installed, according to the New York State Thruway Authority, owner of the New NY Bridge project. The New NY Bridge, also called the Tappan Zee Bridge, is on tra
  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    June 25, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering*. Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s
  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p
  • Canada, US officials soon to settle planned Detroit bridge issue
    February 5, 2015
    An end to a thorny issue is close at hand concerning who will fund construction of a border customs plaza on the US side of a planned bridge linking Canada and the United States. US President Barack Obama’s US$4-trillion budget did not set aside any money for the plaza for a second consecutive year, further irritating Canadian officials who are overseeing construction of the bridge. It appears that the Canadian government might end up footing the entire bill, according to a report in Toronto’s Globe a