Skip to main content

Cross Fraser Partnership wins BC tunnel work

The partnership for the tunnel work near Vancouver in Canada consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and is supported by design and engineering consultant Arcadis.
By David Arminas September 27, 2024 Read time: 2 mins
The new tunnel will be built parallel to and just upstream from the existing 629m-long four-lane Massey Tunnel that was opened in 1959 (conceptual drawing courtesy of BC Government)

Cross Fraser Partnership has been awarded the Design Early Works Agreement (DEWA) for the Fraser River Tunnel Project by the Canadian province of British Columbia.

This agreement signals the start of the development phase, which allows for a transparent and collaborative approach to tunnel design, project schedule, costs and risks associated with the project close to the city of Vancouver.

The new tunnel will be built parallel to and just upstream from the existing 629m-long four-lane Massey Tunnel that was opened in 1959. It was the first project in North America to use immersed tube technology and remains Canada’s only tunnel below sea level and now carries more than its design limit of 80,000 vehicles a day. Extensive renovations to the tunnel and attempts to improve access roads have been done over the years, but the structure has only about 10 years of useful life, according to some reports.

Cross Fraser Partnership is an equal-parts consortium of major Canadian and international construction and engineering firms with a track record in delivering complex infrastructure projects.

The partnership consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and supported by design and engineering consultant Arcadis.

The proposed eight-lane immersed tube tunnel will incorporate advanced engineering solutions and sustainable construction practices, reflecting what the consortium says is its commitment to innovation and environmental stewardship.

The Fraser River Tunnel Project is a key component of the broader Highway 99 Tunnel Programme and the province's broader transportation strategy. The project will improve travel times and reliability, increase connections across the South Arm of the Fraser River near the mouth of the river and support economic growth in the lower mainland region.

The new crossing will be an eight-lane immersed tube tunnel with three general-purpose lanes and a dedicated transit lane in each direction. It will also feature a separate multi-use path to support pedestrians, cyclists and other active transportation options.

The project includes replacing the existing Deas Slough Bridge and the Highway 99 upgrades between Westminster Highway in the city of Richmond and the Ladner Trunk Road in the city of Delta.

An earlier replacement proposal – a 3km-long 10-lane cable-stayed bridge costing US$2.8 billion - was underway in 2015. However, a provincial election in 2017 saw a change of government which promptly scrapped the project in favour of more research and consultation with the mayors of the greater Vancouver area cities and municipalities. In October 2019 the mayors recommended an eight-lane tunnel as the replacement.

Related Content

  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.
  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.
  • BC to renovate Simon Fraser Bridge
    January 20, 2022
    The Canadian province will rehabilitate the deck structure of the southbound bridge of the twin-bridge river crossing in Prince George.
  • Fraser Crossing Partners chosen for new Pattullo Bridge in Canada
    February 25, 2020
    Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.