Skip to main content

Croatia opens 17.5km section of Corridor 5c

The majority of the 5c, or Vc, route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD)
By David Arminas December 14, 2022 Read time: 2 mins
The majority of the 702km route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD) and its partners, in particular the European Union (image courtesy EBRD)

Croatia has opened a section of the European Corridor 5c motorway between Halasica Bridge and the town of Beli Manastir.

Corridor 5c - or ‘Vc’ if using a Roman numeral - is a major pan-European transport link connecting Hungary and eastern Croatia to neighbouring Bosnia and Herzegovina and the Adriatic Sea.

The majority of the 702km route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD) and its partners, in particular the European Union, which helped fund the work.

The completion of the Croatian part of Corridor 5c will enable full integration of the eastern areas of the Slavonia region into the road network and facilitate traffic connections between Croatia and Hungary, contributing to the economic development of the wider region, a notice from the EBRD said.

The EBRD provided a loan of up to €55 million to Croatia’s state-owned national motorways company HAC for construction of the section. In addition, the EBRD is financing a 5km stretch of motorway between the town of Beli Manastir and the Hungarian border, due for completion in 2024. The EBRD’s financing was complemented by a €52 million loan from the Croatian Bank for Reconstruction and Development.

Related Content

  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of
  • Bosnia strategy
    March 1, 2012
    Bosnia & Herzegovina plans to invest some €2.9 billion in constructing highways by 2017.
  • Polish expressway project for STRABAG
    October 20, 2021
    STRABAG is working on a new Polish expressway project.
  • Bechtel Enka opens first section of Pristina-Skopje motorway
    October 29, 2015
    The first part of the €600 million Arber Dzaferi motorway between Pristina, the capital of Kosovo and Skopje in Macedonia, has opened to traffic. US-Turkish consortium Bechtel Enka is contractor for the 60km road that will eventually link Pristina, capital of the former Serbian province Kosovo, and the city of Skopje, capital of Macedonia, a former Yugoslav republic. The road - numerically Route 6 – is Kosovo’s second motorway and is named after the prominent Albanian intellectual and politician from