Skip to main content

Croatia opens 17.5km section of Corridor 5c

The majority of the 5c, or Vc, route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD)
By David Arminas December 14, 2022 Read time: 2 mins
The majority of the 702km route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD) and its partners, in particular the European Union (image courtesy EBRD)

Croatia has opened a section of the European Corridor 5c motorway between Halasica Bridge and the town of Beli Manastir.

Corridor 5c - or ‘Vc’ if using a Roman numeral - is a major pan-European transport link connecting Hungary and eastern Croatia to neighbouring Bosnia and Herzegovina and the Adriatic Sea.

The majority of the 702km route crosses Bosnia and Herzegovina and is a key priority for the European Bank for Reconstruction and Development (EBRD) and its partners, in particular the European Union, which helped fund the work.

The completion of the Croatian part of Corridor 5c will enable full integration of the eastern areas of the Slavonia region into the road network and facilitate traffic connections between Croatia and Hungary, contributing to the economic development of the wider region, a notice from the EBRD said.

The EBRD provided a loan of up to €55 million to Croatia’s state-owned national motorways company HAC for construction of the section. In addition, the EBRD is financing a 5km stretch of motorway between the town of Beli Manastir and the Hungarian border, due for completion in 2024. The EBRD’s financing was complemented by a €52 million loan from the Croatian Bank for Reconstruction and Development.

Related Content

  • Congestion and safety concerns over Serbia’s roads
    February 23, 2012
    With traffic flows on the increase, Serbia needs to improve its road network and safety record, reports Gordon Feller. Serbia's road network needs to upgrade its road system against the backdrop of increased traffic flows. Serbia is crossed by segments of the important Trans European network (TEN). Corridor X with its branches Xb (Belgrade-Budapest) Xc (Nis-Sofia), and Xd (Nis-Presevo), represent the most important transit routes in the Republic, connecting Austria/Hungary, Slovenia/Croatia, and Bulgaria/Ma
  • Cameroon loan for road project
    February 21, 2022
    A loan will help pay for a Cameroon road project.
  • Construction resumes for Bolivian tunnel link
    May 30, 2023
    Construction work is resuming for a major Bolivian tunnel link.
  • Despite earlier contractor issues, road projects in Bosnia are proceeding on track
    May 16, 2012
    Key road construction projects are now moving forward in Bosnia with work on-track for the Sarajevo ringroad as well as the Corridor Vc highway. Construction of a 130km section of the Corridor Vc highway should be complete by 2014 according to Bosnia's Ministry of Transport and Telecoms. Work on the first section of the Sarajevo ringroad should be completed within five months, following the signing of an agreement worth €17 million between the Austrian firm Strabag and the Bosnian company HP Investing. The