Skip to main content

Crawler crane hand-over is big deal at INTERMAT

INTERMAT was the venue for the official hand-over of one of the world’s first Kobelco CKE 2500G crawler cranes. Herman Smit, chief operating officer of crane giant Mammoet, came to the show on Friday to meet Kobeloc Crane’s president and chief executive officer Isao Aida for the handover of the 250tonne lattice boom machine. While he was at the show Smit confirmed orders for another 46 cranes of 180 tonnes and 250tonnes capacity.
January 6, 2017 Read time: 1 min
Herman Smit (Left) takes delivery of a new crane from Kobelco president and CEO Isao Aida
RSSINTERMAT was the venue for the official hand-over of one of the world’s first 2200 Kobelco CKE 2500G crawler cranes.  

Herman Smit, chief operating officer of crane giant 5115 Mammoet, came to the show on Friday to meet Kobeloc Crane’s president and chief executive officer Isao Aida for the handover of the 250tonne lattice boom machine.

While he was at the show Smit confirmed orders for another 46 cranes of 180 tonne and 250tonne capacity.

www.kobelco-cranes.com

For more information on companies in this article

Related Content

  • JCB announces record profit in 67-year history
    January 6, 2017
    JCB has announced the best results in its 67-year history with earnings reaching a new record. While turnover for 2012 remained virtually unchanged at £2.7 billion, profit rose by £10m to £365m on an earnings before interest, taxes, depreciation, and amortisation (EBITDA) basis.
  • JCB announces record profit in 67-year history
    April 15, 2013
    JCB has announced the best results in its 67-year history with earnings reaching a new record. While turnover for 2012 remained virtually unchanged at £2.7 billion, profit rose by £10m to £365m on an earnings before interest, taxes, depreciation, and amortisation (EBITDA) basis.
  • Astec show model of relocateable asphalt plant
    January 6, 2017
    Astec has brought along a detailed model of a complete relocateable asphalt plant to explain the key features. The plant incorporates double-barrel technology. A continuous process delivers virgin aggregates or 50% recycled material into the inner drum where it is dried. The aggregate then drops out to the outer drum, where bitumen is injected. Advantages include guaranteed mixing times and being able to heat the material within a single system.
  • Astec show model of relocateable asphalt plant
    April 16, 2012
    Astec has brought along a detailed model of a complete relocateable asphalt plant to explain the key features. The plant incorporates double-barrel technology. A continuous process delivers virgin aggregates or 50% recycled material into the inner drum where it is dried. The aggregate then drops out to the outer drum, where bitumen is injected. Advantages include guaranteed mixing times and being able to heat the material within a single system.